Quote:
Originally Posted by swimmer_spe
And that is why a bypass is needed.
|
The most I can get behind is ROW designation. If the bottleneck is really bad, it just means that it's time to really sit down and fix the LRT's, even if it means making some incompetent people find other jobs.
Even I don't see Ottawa having hopeless gridlock on the 417 at 6 pm any time soon. This is not Toronto after all.
A freeway connection to Gatineau on the west and/or east end makes more sense priority-wise.