HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jul 24, 2023, 8:42 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,817
Quote:
Originally Posted by Dengler Avenue View Post
The slowdown can be mitigated if and when MTO pushes the 8 lanes all the way to the canal. Sadly there’s one spot where 8-landing isn’t possible and will always create a bottleneck though.
I am not sure it is a bottleneck. Eastbound a lot of traffic exits and at Rochester, Bronson and Kent and isn't really replaced until O'Connor, at which point it is back at 4 lanes. Eastbound it is only 3 lanes between the Metcalfe exit and O'Connor entrance, which again balance each other out pretty well.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:11 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.