Quote:
Originally Posted by Truenorth00
If they build Class 6 track, there's just no reason why they can't make that trip in about 2 hrs from centre to centre. And no grade separation would be needed at crossings.
|
AFAIK, Transport Canada doesn't allow Class 6 without grade separation. Even in the US, while level crossings are permitted, the barriers that are needed for Class 6 are so expensive, you might as well go for grade separation and that gives you an upgrade path to even higher classes.
Quote:
Originally Posted by Truenorth00
If they had a dedicated corridor? Hourly service. Size the train accordingly. A three car DEMU or BEMU in each direction every hour is what I would imagine. Or even just a train with a loco, two cars and a cab car. Their limits on frequency basically come down to sharing agreements with freight in and near cities.
|
The question is, how easily can they get a dedicated corridor. The HFR plan uses underutilized or abandoned corridors. I don't know how easily that could be found between Calgary and Edmonton. The costs would skyrocket if they needed to use a greenfield corridor.
Quote:
Originally Posted by swimmer_spe
They would only need to tunnel in Edmonton as there is still tracks to downtown Calgary.
|
I guess it depends if they want to reroute the line through YYC and have a more direct route downtown.
Quote:
Originally Posted by swimmer_spe
I'll need to look more into it, but I am not certain that the existing line between the cities is very busy, so, a passenger train ruing 4-10 times a day might not be much of a fit.
|
That is the big question. How busy are CP's Leduc and Red Deer Subs? Could they shift their operations at night or use CN's Camrose and Three Hills subs?
Quote:
Originally Posted by swimmer_spe
If this were the only line brought in, I would add a few things to it....
1) realign the Canadian so that it stops at the new downtown Edmonton station. This would means someone from Calgary could catch the Canadian if they wanted to.
|
Not sure if it would be worth the cost, but maybe. I would suggest it be done later rather than risk having the whole project scrapped because this option makes the project too expensive.
Quote:
Originally Posted by swimmer_spe
2) The Jasper-Prince Rupert train, have it terminate in Edmonton. For much of the same reasons. If the 2 are left as not dailies, have them alternate days so that getting to/from Jasper by train is possible daily.
|
The Jasper-Prince Rupert train is already run as 2, daytime trains. VIA's 2019 schedule says it is about 6.5 hours between Edmonton and Jasper. I don't know how feasible it is to add that to the aprox. 7.5 hours between Jasper and Prince George. You would likely end up having to run it over a third day.
Quote:
Originally Posted by swimmer_spe
3) Extend the new service to Banff and Lake Louis. 9 million people a year, with 80% going in June July and August could see this as a great way to avoid the traffic.
|
The Banff part at least is being proposed as a separate project. If it is already complete, then sure. If not, once again I would suggest it be done later rather than risk having the whole project scrapped because this extension makes the project too expensive.
Quote:
Originally Posted by swimmer_spe
The Calgary-Edmonton train shut down as part of the cuts in 1989. It is clear this should not have happened. If it were still running, it might have double it's former ridership.
|
No point crying over split milk.
Quote:
Originally Posted by swimmer_spe
For the southern Canadian, that is a messier situation.
|
Agreed. Lets take things 1 step at a time and not over-complicate things.