AFAIK, Transport Canada doesn't allow Class 6 without grade separation. Even in the US, while level crossings are permitted, the barriers that are needed for Class 6 are so expensive, you might as well go for grade separation and that gives you an upgrade path to even higher classes.
If that's the case, then how exactly are they engineering HFR, because last I checked, this was the whole premise behind the project: minimal cost by avoiding grade separation and land acquisition.

Quote:
Originally Posted by roger1818 View Post
The question is, how easily can they get a dedicated corridor. The HFR plan uses underutilized or abandoned corridors. I don't know how easily that could be found between Calgary and Edmonton. The costs would skyrocket if they needed to use a greenfield corridor.
They'll need a new line and possibly new corridor. It won't be cheap. Like I said, probably $2-3B. Which is not cheap, considering that HFR is over $4B for nearly double the distance. But it's marginally defensible on economic development grounds and might get Albertans to stop whining that the feds never do anything good for their province.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 9:51 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.