HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 18, 2018, 4:57 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,090
Quote:
Originally Posted by Sheba View Post
Chopping the Pink line into two parts: the southern section is the Arbutus Greenway, which will be some variety of surface rail. The Hastings section (connecting to the North Shore instead) would be tunnelled Skytrain. They've already stated a maximum 6% grade so up Burnaby Mountain and back down again is a no go, and unless they decided to build a north - south line waaaay east of Willingdon there's no real terminus in Burnaby. We're better off terminating it at an enlarged Kootenay Loop.
Don't suppose there's a way to twin the Expo mid-Burnaby and let a Hastings or Willingdon Line take over the Production Way-SFU branch?
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:57 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.