Quote:
Originally Posted by Sheba
They've already stated a maximum 6% grade so up Burnaby Mountain and back down again is a no go.
|
From what I understand the theoretical maximum of the LIM motors is 10% but because of snow and possibly comfort they limit it to 6%. I wonder however, if an exception would be considered if the grade were to be in a bored tunnel where you don't get snow and rain on the rails and people on the train won't likely notice the steepness of the grade because they lack a horizon outside of the train (similar to how an aircraft without IFR goes VFR into IMC).
I did some calcs on what the escalators would have to be in order for the grade to be 6%:
- 6.0% Skytrain Grade = 62 m station depth at Univercity Plaza = 108 m escalator length = 3.5 min standing on escalator
- 6.5% = 50 m depth = 86 m escalator = 2.9 min
- 7.0% = 37 m depth = 64 m escalator = 2.1 min
- 7.5% = 24 m depth = 41 m escalator = 1.4 min
- 8.0% = 10 m depth = 18 m escalator = 36 sec
The likely cost of going this straight line route alone would be likely be about 2.5 billion so its of course not going to happen anytime soon, or ever, particularly if the Gondola is still an option.
I think a more likely scenario if Skytrain were to ever reach SFU would be for it to follow up the Parkway from Hastings at a 7% grade. Some cut and cover excavation would be needed higher up but it is possible. It would make a nice connection to be able to go up the gondola from Production Way then transfer on to the Hastings Line right at SFU. Also because half of it would be at grade, there isn't much land to expropriate and because cut and cover is significantly simpler, cheaper and faster than bored tunnels, the 3km track up from Hastings could be significantly cheaper. If we assume that the project costs about the same as the Evergreen Line, then the whole 12km from Downtown to SFU would be about 1.5 billion in 2016 dollars which is not totally bonkers.