Quote:
Originally Posted by Mac Write
Someone said awhile ago that Lougheed station was supposed to be built down the centre of North Road this was 1997 time frame.
|
Planning for the Millennium Line
Here's the reference to the Connectivity Report with diagrams.
It was to be north-south - probably in the Lougheed parking lot - maybe on North Road(?).
Quote:
FYI - M-Line background information here:
Note the "Connectivity Report" which identifies issues dealing with interlining.
Note, however, that the report dates back to when the system design
called for a north-south Lougheed station with a south facing wye
(to enable a one seat ride to Columbia from Coquitlam and one transfer to Surrey),
as opposed to the east facing wye that was actually built.
http://www.llbc.leg.bc.ca/public/Pub...rainReview.pdf
Map from the above report (showing a N-S Lougheed Station) - note that Grandview Station was subsequently deleted in its entirety and this shows the original VCC Station under Broadway rather than on the flats.
|
http://forum.skyscraperpage.com/showpost.php?p=4492482&postcount=849
http://www.llbc.leg.bc.ca/public/Pub...rainReview.pdf
http://www.llbc.leg.bc.ca/public/Pub...rainReview.pdf
http://www.llbc.leg.bc.ca/public/Pub...rainReview.pdf
http://www.llbc.leg.bc.ca/public/Pub...rainReview.pdf
RTPO 2000 - Millennium Line
Here's the final RTPO 2000 plan for Lougheed with the east-west station and the basketweave.
The basketweave was to facilitate a terminus at VCC (or beyond) for both Expo Line and Millennium Line trains,
allowing both lines' VCC-bound trains to stop at the same platform (marked "Vancouver" on the first diagram).
That avoided the problem that Toronto's TTC had at Bay Station & St. George Station during their brief interlining project when the
Bloor-Danforth Line was first opened, where trains with the same destination were split between 2 platforms and passengers
at the wrong platform would miss the "next" train.
With the Expo Line terminating at Production Way Station, the problem would affect fewer passengers,
hence the current decision to split the westbound platforms.
Evergreen Extension
And the Evergreen Extension (as SkyTrain) Operations diagram from the Partnerships BC website (?) without the basket weave.