HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #3481  
Old Posted Jun 30, 2026, 10:44 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,799
Quote:
Originally Posted by bomberjet View Post
Ah ya. I had done some work for MTI of PTH 75 at the border crossing. And they did they same thing there. Rubbelizing seems like some kind of voodoo.
Is rubbelizing the same thing as the proof rolling to crack and seat bad pavement that the City of Winnipeg tried on a number of streets about 10 or 15 years ago? I remember they did it on the 500 block of my street and a street in NK that friends of mine lived on.

I have not seen any tenders for that so maybe it was not what they expected it to do.

Same as diamond grinding concrete pavement to smooth it out, it seemed to be done a few times on a few major streets like Chief Peguis west of Henderson and some of Bishop Grandon but I have not seen any tenders for that in a while either.
Reply With Quote
     
     
  #3482  
Old Posted Jul 1, 2026, 1:12 AM
plrh plrh is offline
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 944
There is only one company in North America that rubblizes highways.
https://www.antigoconstruction.com/rubblization

Every contractor uses them.

In the city, contractors use a breaker (big jackhammer) attached to an excavator. The distances are much smaller.
Reply With Quote
     
     
  #3483  
Old Posted Jul 1, 2026, 4:49 AM
Carboy15's Avatar
Carboy15 Carboy15 is offline
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 594
Reply With Quote
     
     
  #3484  
Old Posted Jul 1, 2026, 4:00 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,855
I’m pretty sure they used rubblization on Abinojii. The used a big tractor trailer looking machine with what looks like dozens of oversized pins to break the concrete.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #3485  
Old Posted Jul 1, 2026, 7:07 PM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,375
What is the distance on 75 south of Winnipeg to the US border ?
Reply With Quote
     
     
  #3486  
Old Posted Jul 1, 2026, 7:12 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,799
Quote:
Originally Posted by Biff View Post
I’m pretty sure they used rubblization on Abinojii. The used a big tractor trailer looking machine with what looks like dozens of oversized pins to break the concrete.
Looking at the tender specs for the Abinojii project, that sounds like the 2nd pass device to further break up the pavement after the mobile hammer breaker rig has gone by.

Or at least that was what was being asked for. The winning contractor may have proposed a different but equivalent way to break the pavement into the rubble sizes that were being asked for.
Reply With Quote
     
     
  #3487  
Old Posted Jul 1, 2026, 9:38 PM
WayneShuster WayneShuster is offline
Registered User
 
Join Date: Apr 2026
Posts: 99
Quote:
Originally Posted by craner View Post
What is the distance on 75 south of Winnipeg to the US border ?
Roughly 94kms from the Winnipeg Bypass Junction.
Reply With Quote
     
     
  #3488  
Old Posted Jul 2, 2026, 1:44 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,226
Quote:
Originally Posted by Carboy15 View Post
I've been travelling to St Malo recently. In the twinning plans, interchanges at Niverville and Steinbach turn-offs should be included. Actually just mainline the twinned 59 straight onto twinned 52 heading to Steinbach. Make it one highway, full speed, and have an exit to head south on 59 from there.
Reply With Quote
     
     
  #3489  
Old Posted Jul 2, 2026, 1:50 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,226
The concept of rubbelization makes sense I guess. I just have no experience on the consistency of breaking the concrete down and the compacting it. And how consistent the outcomes are vs what would seem to be seem to be a difficult task. Ie: Breaking 8" or 10" of concrete down into small pieces similar to gravel, then compacting it to spec. Co-Pilot tells me (lol):

Concrete rubblization is a construction technique that breaks existing concrete into small fragments to create a base for new pavement or to decommission structures, saving time, cost, and materials.

What is Rubblization?
Rubblization involves fracturing existing concrete in place into small pieces, typically ranging from sand-sized particles to 4–8 inches in width, using specialized equipment such as hydraulic breakers or resonant beam machines. This process destroys the concrete slab’s structural integrity, turning it into a flexible, interlocked base material suitable for overlaying with asphalt or other pavement types. The technique eliminates reflective cracking, which occurs when asphalt overlays crack above concrete joints due to temperature and load stresses.

Applications
Road Rehabilitation: Rubblization is widely used to rehabilitate deteriorated Portland cement concrete roads. The fractured concrete serves as a base for a new asphalt overlay, providing a smoother surface and extending pavement life . It is particularly effective for roads with severe material durability issues, such as alkali-silica reactivity, D-cracking, or freeze-thaw damage.
Reply With Quote
     
     
  #3490  
Old Posted Jul 2, 2026, 6:09 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,226
I'm going to imagine the extreme weather events occurring will have an impact on future project budgeting. Ie: there's a boat load of water coming through the Assinniboine at this point. Shellmouth spillway is running very high. What the impacts will be at Portage we will see. Portage Diversion will surely be activated. There's still ~2 months to go on the severe weather front.

The numerous washouts, including what looks to be like some significant concrete box culvert type structures. Depending upon how things go throughout the watershed including Lake Manitoba, there could be significant costs this summer.
Reply With Quote
     
     
  #3491  
Old Posted Jul 12, 2026, 7:09 PM
Carboy15's Avatar
Carboy15 Carboy15 is offline
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 594
Quote:
Originally Posted by bomberjet View Post
I've been travelling to St Malo recently. In the twinning plans, interchanges at Niverville and Steinbach turn-offs should be included. Actually just mainline the twinned 59 straight onto twinned 52 heading to Steinbach. Make it one highway, full speed, and have an exit to head south on 59 from there.
Hwy 52 and 311 would definetely be core Intersections that would need to be looked at for futureproofing. I have kinda thought about making PTH 59 and 52 into one mainline expressway from Ile Dès Chênes to Mitchell.

But I was thinking maybe it would be a better idea to just have a conventional 3-Way Intersection at 59 @ 52. Eventually they could just build a trumpet Interchange at 52 and maybe a Diamond or Parclo at 311. But maybe if they were to do a mainline, an Intersection could look like this;

https://stroadz.glide.page/dl/d0a5f4/s/c0a8e8/r/oD2AlCvIijqw5vPZwr2M

Probably won't happen for a while, but I'm sure that Hwy 59 South of 52 (towards St Pierre Jolys) would be twinned eventually. Therefore having Hwy 59 just continue straight south with a 52 Intersection would be best. Highly doubt it would be twinned all the way to the US Border for a long time. But I can see once twinning happens, it would be used as a high quality alternative route for 75 during flood season (kinda already is).
Reply With Quote
     
     
  #3492  
Old Posted Jul 14, 2026, 2:46 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,226
Nah I'd just mainline it to Steinbach and put a trumpet for the 59/52 interchange. Simple diamond for Niverville. I don't see 59 south of the being twinned until next millennium. Traffic going north on 59 is inconvenienced at the trumpet yes, but overall would probably be the most cost effective option for an interchange. Doing directional ramps there seems excessive. In the end it will probably just be traffic signals..
Reply With Quote
     
     
  #3493  
Old Posted Jul 14, 2026, 2:59 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,226
Speaking of 59, this time going north to Grand Beach. The highway is in pretty bad shape. At minimum they should upgrade the current lanes to have proper paved shoulders and re-surface the whole stretch from the twinned portion northwards.
Reply With Quote
     
     
  #3494  
Old Posted Jul 14, 2026, 5:54 PM
BorealLynx BorealLynx is offline
Registered User
 
Join Date: Aug 2025
Location: Kenora, ON
Posts: 50
Quote:
Originally Posted by bomberjet View Post
Nah I'd just mainline it to Steinbach and put a trumpet for the 59/52 interchange. Simple diamond for Niverville. I don't see 59 south of the being twinned until next millennium. Traffic going north on 59 is inconvenienced at the trumpet yes, but overall would probably be the most cost effective option for an interchange. Doing directional ramps there seems excessive. In the end it will probably just be traffic signals..
I grew up along Hwy 59 south of 52. Two things to note. First, the further south you go from the 52 intersection, the lower the traffic gets. There is almost negligible traffic through Tolstoi and across the US border (their border crossing stats should bear that out).

Second, there is no way in our lifetimes that 59 would ever have the traffic volumes to justify twinning south of 52. It mostly feeds St. Pierre, Grunthal, and St. Malo and the park in summer. None of those are exactly hot spots for growth, and they are too far from the city to ever be bedroom communities (except maybe St. Pierre, but its population growth doesn't bear that out).

TL;DR - Don't bother planning for twinning 59 south of 52.
__________________
NOW is the time for a National Highways strategy for Canada.
One Trans-Canada Highway, federally funded, 4-lane "Interstate" quality, from coast to coast.
Reply With Quote
     
     
  #3495  
Old Posted Jul 14, 2026, 8:16 PM
NewIreland NewIreland is offline
Registered User
 
Join Date: Aug 2019
Posts: 549
Somehow Eastern Canada managed to pretty much mirror the US standard when it comes to highway construction. You can travel from Windsor to Halifax on controlled access freeway built to a very high standard. However, when I moved to Winnipeg 10 years ago I was completely shocked. The lack of a national highway policy in Canada really shows in the Western Provinces. I love the fact that that there are no controlled access freeways inside the Perimeter, but the entire Perimeter should be a controlled access freeway AT BARE MINIMUM. Don’t get me started on the 3rd world bush trail that is the trans Canada west of Ottawa.
Reply With Quote
     
     
  #3496  
Old Posted Jul 14, 2026, 8:52 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
Quote:
Originally Posted by NewIreland View Post
Somehow Eastern Canada managed to pretty much mirror the US standard when it comes to highway construction. You can travel from Windsor to Halifax on controlled access freeway built to a very high standard. However, when I moved to Winnipeg 10 years ago I was completely shocked. The lack of a national highway policy in Canada really shows in the Western Provinces. I love the fact that that there are no controlled access freeways inside the Perimeter, but the entire Perimeter should be a controlled access freeway AT BARE MINIMUM. Don’t get me started on the 3rd world bush trail that is the trans Canada west of Ottawa.
You need to travel some rural two lane highways in MB to get that quality experience. The ones that were neglected for sixty years. 23 from Somerset to Ninette is a good start.
Reply With Quote
     
     
  #3497  
Old Posted Jul 14, 2026, 9:26 PM
BorealLynx BorealLynx is offline
Registered User
 
Join Date: Aug 2025
Location: Kenora, ON
Posts: 50
Quote:
Originally Posted by NewIreland View Post
Somehow Eastern Canada managed to pretty much mirror the US standard when it comes to highway construction. You can travel from Windsor to Halifax on controlled access freeway built to a very high standard. However, when I moved to Winnipeg 10 years ago I was completely shocked. The lack of a national highway policy in Canada really shows in the Western Provinces. I love the fact that that there are no controlled access freeways inside the Perimeter, but the entire Perimeter should be a controlled access freeway AT BARE MINIMUM. Don’t get me started on the 3rd world bush trail that is the trans Canada west of Ottawa.
For a true Canadian experience, try driving the TCH from Ottawa (Renfrew) to Winnipeg (Whiteshell). Take bets on whether or not you will make the journey alive. Lots of residents of Northern Ontario have to drive this on a regular basis, and it's a crap shoot every time you get in your car. Some don't make it home alive, but most do, and the rest of Canada doesn't care either way because "Nobody lives here anyway".

Oh, and by the way this is our "National" highway.
__________________
NOW is the time for a National Highways strategy for Canada.
One Trans-Canada Highway, federally funded, 4-lane "Interstate" quality, from coast to coast.
Reply With Quote
     
     
  #3498  
Old Posted Jul 14, 2026, 9:40 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
Quote:
Originally Posted by BorealLynx View Post
For a true Canadian experience, try driving the TCH from Ottawa (Renfrew) to Winnipeg (Whiteshell). Take bets on whether or not you will make the journey alive. Lots of residents of Northern Ontario have to drive this on a regular basis, and it's a crap shoot every time you get in your car. Some don't make it home alive, but most do, and the rest of Canada doesn't care either way because "Nobody lives here anyway".

Oh, and by the way this is our "National" highway.
I did this last summer. I think this would be my fifth or sixth time. Even had my kids along with me. We survived.

I even did it in a rear wheel drive Mustang in December of 1994... and a Jeep TJ from Regina to Montreal in November 2001.

I understand you want a full freeway, but it is not as dangerous as you make it out to be.
Reply With Quote
     
     
  #3499  
Old Posted Jul 15, 2026, 12:33 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,471
Quote:
Originally Posted by harls View Post
I did this last summer. I think this would be my fifth or sixth time. Even had my kids along with me. We survived.

I even did it in a rear wheel drive Mustang in December of 1994... and a Jeep TJ from Regina to Montreal in November 2001.

I understand you want a full freeway, but it is not as dangerous as you make it out to be.
I've done them all;

The 17 through Cochrane;
The TCH via the Soo
US Highway 2 through the UP and Duluth; and
The full interstate through Chicago and Detroit.

The only one that I feared for my life was from Chicago to Detroit. The truck traffic was NUTS!!!
Reply With Quote
     
     
  #3500  
Old Posted Jul 15, 2026, 1:21 PM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,774
Quote:
Originally Posted by bomberjet View Post
Speaking of 59, this time going north to Grand Beach. The highway is in pretty bad shape. At minimum they should upgrade the current lanes to have proper paved shoulders and re-surface the whole stretch from the twinned portion northwards.
The Southbound 59 starting bit from from 317 got a great smooth top up in pst month, feels great driving on it! and it's just a asphalt top but man it was done quick!
__________________
just an ordinary Prairie Boy who loves to be in the loop on what is going on
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 2:03 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.