HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 1, 2026, 5:18 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,664
I suspect the curves are there because of hydrology issues connected to Pinecrest Creek. They basically had to realign the creek in that area and daylight portions of it that were concealed in culverts.

That said, I really wished they had pushed both Iris and Algonquin stations about a hundred metres northward. I also think they should have not given up on the bus platforms on the Queensway, they might prove to be useful in the future. Had the station been completely north or Iris those stairs and elevators would be within easy walking distance.

When the Baseline Transitway becomes a reality, the detour to Algonquin station will result in a big loss in time and energy.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:20 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.