Quote:
Originally Posted by adamuptownsj
When was the last time a K-12 school was built, let alone an urban one?
|
They're building an anglophone k-12 in Shediac as we speak.
I imagine it has to do with servicing a minority population in a single large building. Anglophones are the minority in both Shediac and Dieppe.