HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #8  
Old Posted Nov 29, 2025, 4:49 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is online now
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,671
Quote:
Originally Posted by J.OT13 View Post
That was the estimate initially before all the slow orders. Decreasing the dwell times is by far the best thing they could do to minimize the impacts, but those dwell times continue to be ridiculously long. They bother me more than the slow orders.
I suspect the long dwell times are part of the cost cutting measures. They make up some time to make the 10 minute frequency work. I estimate the extra 30 seconds at each station adds roughly 30% to the trip length which also means you can put less trains in the system. I don't really take the O-Train during rush hours, do people notice that the dwell times are shorter on the peak periods?

When the east extension opens they'll have to rework the schedule and frequencies, and I hope the dwell times get shortened as a result.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:45 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.