Quote:
Originally Posted by Franky
|
Good question. I'm not sure if that's a typo or if there's something more to it. The Carling Tech Memo assumes the average operating speeds are roughly the same...Suzie pointed out this is unlikely because Doucet/Leadman planned more stops along Carling. Plus you've got two awkward 90 degree turns.
Speaking of which, Morrison Renfrew conveniently didn't cost that very complicated junction...it would require a significant amount of excavation and/or tunneling.