HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Nov 14, 2008, 7:44 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by lrt's friend View Post
What are you talking about? Half speed trains? You are using existing track, with speed limits and level crossings in an urban area. Let's be realistic about how fast trains will be allowed to operate. Why would you not include waiting time? It is part of a passenger's trip. Why would you not include the trip back to downtown? It is the most important destination.
I'm talking about the original E-W line that pushed for that section of rail to go back full speed. This was part of the rationale. To be realistic would be to continue using the changes that were to be put in place.

Because you don't go to a stop 10 minutes in advances. They took the average between two trains. Because they haven't made the case for destinations, only for a trival downtown station. People working at the hospitals and the area, and if a bigger network would have been in place, it would have saved even more time.

It was not that the route would not have been popular, it was there was no room to grow after a certain point, and conversion of the corridor was mandatory, oh my, just like the Mayor's Task report suggested. This was the point for the original O-Train link, except in this case, there's no need to tear up the tracks and start over again.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:50 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.