I intended to say starting, not finishing.

The Byrum will be ready as they are hiring and creating/expanding what will lease that space. I changed it on the original post.
It does appear as if work stopped on the second Metropolitan Village apartment building and I see the renderings were taken-down from the site. I think part of their demand depended on the next phase of the IQ and that phase won't start until roughly three years from now. The IQ's Phase II was scheduled to have demand-generating buildings by now, before the Pandemic changed those plans. Maybe they are waiting for stabilization at their current buildings? They did prepare the site and it appeared as if it was starting. I'll look into it.