Looks like after Site-C, it is time to start looking at another large scale hydro project in BC. Site-E is now being considered.....
This one comes very close to the BC/Alberta border. We will have to see, Alberta responds.
Quote:
B.C. eyes two new hydropower dams, including Site E near Alberta border, Dix says
The so-called Site E project would have a capacity of up to 750 megawatts, while a project near Bute Inlet northeast of Powell River would be bigger at 900 megawatts.
The Site E dam was originally proposed in 1958, along with four other Peace River sites, including the recently completed Site C project, which is now known as the John Horgan Dam. That massive dam has a capacity of up to 1,230 megawatts.
|
Source:
https://www.timescolonist.com/local-news...-e-near-alberta-border-dix-says-12424479
Ideal is we build these now, force the LNG terminals to use hydro instead burning natural gas. LNG is a transitioning fuel, as the world moves off of it and the LNG fades, BC is left with fully paid for low cost hydro. Win-win for everyone.