Looks like the Province is going ahead with re-construction of the final stretch of PTH 75 southbound. That'll finish off re-construction of the entire length of PTH 75, both directions. Probably be time soon to go back and start paving works on the stretches that were first done.
https://news.gov.mb.ca/news/?archive=&item=74346
The other big piece in the works is the Morris River bridge north of town.