Posted Jun 25, 2026, 12:29 AM
|
|
Moderator
|
|
Join Date: Jan 2014
Posts: 4,047
|
|
At Main, new sidewalks have been poured along Broadway over the past few days and are now open. The entire length of the south side is open to pedestrians. Most of the construction fencing along the street has also been removed.
Power washing of the curb lanes is ongoing which I take indicates their opening is imminent.
|