HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted May 6, 2026, 5:40 PM
Truenorth00 Truenorth00 is online now
Registered User
 
Join Date: May 2017
Posts: 28,742
Quote:
Originally Posted by MonctonRad View Post
60m? Why do they need a ROW that wide? That's 2/3rds the length of a football field!

A 60m corridor could certainly impact on the profitability of a small family farm..........
The 401 maintains a 300 ft (> 90m) wide right-of-way through most of Eastern Ontario.

Typical HSR RoWs in rural Europe are 30-40m. However, that doesn't always include access roads, electrification, etc. Alto says 60m includes all this:



It's probably padding a bit and will refined over time. And will have cut outs in different spots. I strongly suspect they are also planning for 3-4 tracks from the start, even if that's not what is being delivered at launch.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 1:51 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.