HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #26  
Old Posted Apr 30, 2026, 5:34 PM
Keith P.'s Avatar
Keith P. Keith P. is offline
Registered User
 
Join Date: Mar 2006
Posts: 8,759
The preferred plan was always for a new "new bridge" to be built parallel to the MacKay. That is the only location that makes sense given approaches on either side.

I can see the old "new bridge" being limited to passenger vehicles and light trucks only, like the Macdonald is, to extend its life and reduce maintenance demands. Cable-stayed bridge designs are the current soup du jour in the engineering community.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:48 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.