Quote:
Originally Posted by Spr0ckets View Post
I imagine the fact that these are enclosed balcony system, along with the installation of that lighting feature - all imply that the balcony railing and finishing will take longer than it would for a typical tower with standard non-enclosed balconies.

Also, it might simply be a matter of schedule management.
They might simply be slow-walking the completion of those two shorter towers to allow the taller tower to top out and have the entire development's completion to be more in sync.
As per the rezoning application (similar to the Brentwood project), Phase 1 is split into sub‑phases A and B.
Phase 1A includes the 33‑ and 45‑storey towers, while Phase 1B includes the 65‑storey signature tower.
Based on the Brentwood project, Phase A was completed and occupied several months ahead of Phase B, and I would expect a similar sequencing and timeline to occur here.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 9:00 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.