Quote:
Originally Posted by roger1818
I agree. Even if they could match the 2.5 hour travel time (to South Edmonton) of the service prior to 1990
|
If they build Class 6 track, there's just no reason why they can't make that trip in about 2 hrs from centre to centre. And no grade separation would be needed at crossings.
Quote:
Originally Posted by roger1818
...with 4 daily departures (instead of 2 on weekdays and 1 on weekends) and keep the reliability high, it could work and give something to build upon.
|
If they had a dedicated corridor? Hourly service. Size the train accordingly. A three car DEMU or BEMU in each direction every hour is what I would imagine. Or even just a train with a loco, two cars and a cab car. Their limits on frequency basically come down to sharing agreements with freight in and near cities.
Quote:
Originally Posted by roger1818
Getting to downtown Edmonton could be an issue though.
|
This is why I said under $3B and not under $1B. Tunneling roll be needed in the cities.