HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted May 21, 2024, 8:27 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
General Infrastructure Projects

They City is working on a $7M plus infrastructure project to tunnel under Wharncliffe Rd just south of Riverside Dr to increase trunk sewer capacity.



A micro tunneling machine is being used to reduce disruption on Wharncliffe Rd.



https://london.ctvnews.ca/micro-tunnelin...-open-capacity-for-development-1.6895191
Reply With Quote
     
     
  #2  
Old Posted May 30, 2024, 1:26 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Interesting move to shutdown one of their steam lines that supplies heating to 17 buildings downtown.


“After rigorous investigations, LDE has determined that, despite regular maintenance of the system equipment, portions of the steam system will become increasingly unreliable,” said Jason Brimble, an executive vice-president.


It wasn't that long ago they made a big investment in expanding their plant at Bathurst and Colborne streets.




https://lfpress.com/business/local-busin...heat-as-unreliable-old-system-shuts-down
Reply With Quote
     
     
  #3  
Old Posted Jun 9, 2024, 8:35 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
City is planning to do rehabilitation of the Byron bridge to extend its life until such time as a replacement bridge is built.


Byron Bridge was originally constructed in 1965 and is located on Boler Road over the
Thames River (Figure 1). The structure is a five span precast concrete girder bridge and
supports an average daily traffic volume of 21,000 vehicles per day and a significant
number of pedestrians and cyclists. The structure has a sidewalk on the west side and
supports a watermain and a sanitary sewer



https://pub-london.escribemeetings.com/filestream.ashx?DocumentId=109046
Reply With Quote
     
     
  #4  
Old Posted Jun 11, 2024, 8:28 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Replacement water reservoir is twice the size of previous one in Byron. Now under construction at cost of $48M.



https://lfpress.com/news/local-news/water-reservoir-under-construction-london
Reply With Quote
     
     
  #5  
Old Posted Aug 14, 2024, 12:26 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Of note apparently staff say a sewer capacity project for the Forks of the Thames will be built in 2025 that will support an additional 17,000 units in the core during PEC today.

"Downtown councillor David Ferreira, who isn’t a member of the committee, also pointed to a sewage collection line that’s due to be built in 2025 under the fork of the Thames, which staff say will add 17,000 housing units of capacity."

https://lfpress.com/news/local-news/politicians-endorse-projects-adding-new-london-homes
Reply With Quote
     
     
  #6  
Old Posted Aug 26, 2024, 3:57 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,284
The premier was in London today, along with the Infrastructure Minister, to announce funding for the city’s downtown sewer expansion, which will replace 175 metres of sewer under the Thames River and allow for additional capacity of 17,500 homes.

"Ontario’s top politician unveiled the funding [of $24 million] as one of the first projects under the newly unveiled Housing-Enabling-Water Systems program, which has a total of $970 million in its coffers amid a Queen’s Park push to speed up home construction provincewide."

LFP article: https://lfpress.com/news/local-news/tori...wntown-sewer-upgrades-to-serve-new-homes

CTV article: https://london.ctvnews.ca/provincial-funds-to-build-more-homes-in-london-1.7014284

CBC article: https://www.cbc.ca/news/canada/london/pr...-spur-london-s-downtown-growth-1.7305008

Last edited by CanadianTalk; Aug 26, 2024 at 6:34 PM. Reason: added CBC article
Reply With Quote
     
     
  #7  
Old Posted Aug 26, 2024, 11:23 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
"the city's director of wastewater, was at Monday's funding announcement and said while the pipe was already due for replacement, the plan now is to also enhance the capacity by installing multiple connections under the river. "

Did I read this right? How was the previous plan to replace it not about enhancing the capacity?

This is 100 year infrastructure and when you replace it you do so with a vision for the volumes and capacities your modeling expects will be needed 100 years into the future NOT the past or present.


https://www.cbc.ca/news/canada/london/on...-spur-london-s-downtown-growth-1.7305008
Reply With Quote
     
     
  #8  
Old Posted Aug 27, 2024, 2:02 PM
GreatTallNorth2 GreatTallNorth2 is online now
Registered User
 
Join Date: May 2006
Posts: 1,731
Should anything surprise us about the city of London anymore? The fact that Josh has championed building tens of thousands of new residences in the city and we don't have the infrastructure to build the houses when big downtown proposals come up baffles me. Hey developer, please build downtown highrises! And when they say "yes" we reply "no, not for at least a year as we are not ready". How can a city this big be so dumb??
Reply With Quote
     
     
  #9  
Old Posted Oct 16, 2024, 12:54 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Large concrete storm sewer pipe segments being staged along Riverside Dr just west of the Forks in preparation for the storm sewer replacement project the city recently got some federal funding for.
Reply With Quote
     
     
  #10  
Old Posted Nov 6, 2024, 10:15 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Installation of the large sewer pipes along the south side of Riverside Drive just west of the Forks has been very busy this week.
Reply With Quote
     
     
  #11  
Old Posted Nov 23, 2024, 2:11 AM
tyeman200's Avatar
tyeman200 tyeman200 is offline
Registered User
 
Join Date: Sep 2014
Posts: 391
Quote:
Originally Posted by GreatTallNorth2 View Post
Should anything surprise us about the city of London anymore? The fact that Josh has championed building tens of thousands of new residences in the city and we don't have the infrastructure to build the houses when big downtown proposals come up baffles me. Hey developer, please build downtown highrises! And when they say "yes" we reply "no, not for at least a year as we are not ready". How can a city this big be so dumb??
As someone who works in the trades, London needs to start getting their shit together. I've been hearing from tons of contractors and stuff that they don't want to build here anymore and do work because pulling permits and shit is too hard and London makes it so impossible compared to other cities.
Reply With Quote
     
     
  #12  
Old Posted Dec 9, 2024, 2:43 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Queens Street bridge rehab takes another step. Likely 2026 construction start.

https://www.cbc.ca/news/canada/london/ma...london-s-downtown-and-west-end-1.7403637
Reply With Quote
     
     
  #13  
Old Posted Dec 31, 2024, 8:14 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Reply With Quote
     
     
  #14  
Old Posted Jan 5, 2025, 4:27 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Work has started at Greenway Sewage Treatment plant on flood proofing.

https://lfpress.com/news/local-news/flood-proofing-project-sewage-treatment-plant-london
Reply With Quote
     
     
  #15  
Old Posted Mar 10, 2025, 4:30 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Next stage of the downtown sewer replacement project starts with clearing trees at the forks.

https://www.cbc.ca/news/canada/london/tr...ark-to-make-way-for-sewer-work-1.7477979
Reply With Quote
     
     
  #16  
Old Posted Mar 12, 2025, 7:37 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
They have been making alot of progress on the rebuilt water reservoir. The floor is now poured and they have poured a lot of the posts and side walls. These are over 20 feet tall and when complete will create a large swimming pool to store the water. Wonder if they intend to cover the roof with soil or put solar panels on it?

https://getinvolved.london.ca/springbankreservoir

Quote:
Originally Posted by jammer139 View Post
Replacement water reservoir is twice the size of previous one in Byron. Now under construction at cost of $48M.



https://lfpress.com/news/local-news/water-reservoir-under-construction-london

Last edited by jammer139; Mar 12, 2025 at 7:58 PM.
Reply With Quote
     
     
  #17  
Old Posted Apr 21, 2025, 1:53 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Work continues in forming and pouring the large walls of the new reservoir on Commissioners Rd on Reservoir Hill.
Reply With Quote
     
     
  #18  
Old Posted Jul 7, 2025, 2:39 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Still working on forming and pouring the new Water Reservoir walls and posts. Have started forming for the roof slab on the west end.
Reply With Quote
     
     
  #19  
Old Posted Jul 7, 2025, 9:45 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,192
Forgot a snapped off a couple quick pics one day last week. Not the greatest. Will have to try to get the drone over their one day soon.



Reply With Quote
     
     
  #20  
Old Posted Aug 22, 2025, 12:27 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Ivy Park to be closed during the next phase of the sewer replacement project across the Forks of the Thames.


https://www.cbc.ca/news/canada/london/do...vey-park-mitchell-a-baran-park-1.7614069
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:33 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.