TerraCanada National Capital Area Lab Facility Component 1 (NRC South Campus, Montreal Road)
The facility will be under Natural Resources Canada (CanmetMINING and Geological
Survey of Canada) and Canadian Nuclear Safety Commission . The Proposal has been developed by PSPC as part of the Laboratories Canada
initiative: a long-term strategy to strengthen federal science through collaboration by
bringing scientists together in built-to-last facilities.
The building will house around 490 employees in 33,500 square meters. Provided will be 48 bicycle spaces (25 secured interior) and 196 parking spaces.
Planning and development schedule:
April 2026 – Mobilization and Preparatory Works (subject to L2 federal approval)
December 2031 – Substantial Completion
Presentation:
https://ncc-website-2.s3.amazonaws.com/d...ada-lab-conception100design-sept2025.pdf
Submission:
https://ncc-website-2.s3.amazonaws.com/documents/Summary-TerraCanada-lab-design100-sept2025.pdf