Quote:
Originally Posted by SL123 View Post
Thanks!! So this is still an insanely slow construction even above ground it sounds like. Been two months since they reached ground level.
Pouring 4th floor now. Y’a a bit slower. 1 story per two weeks compared to your typical 1 to 1.
Reply With Quote
     
     