Quote:
Originally Posted by Migrant_Coconut
Gotcha. Though I believe the "exact opposite" would be saying that Joyce works better.
It was something about how the South Van line should be 41st or 49th, and that 41st to Metrotown would be the "better" option; law of parsimony/Occam's razor would say otherwise.
|
I was going to respond tomorrow when I have more time, but no.
From the 2022 TSPR:
13889 western part of 049 between Langara and Metrotown
8483 eastern part
049 stations: 22372 boardings/departures/weekday
R4 + 041 stations: 17575 + 8005 = 25580 boardings/departures/weekday
There's not much difference in demand for the stations between Joyce/Metrotown and Cambie.
You're effectively adding extra line for nothing, and this is only viable if you tunnel the entire way.
049 used to have more demand than 041, as the travel time differential between them was low.
Punjabi Market seems to be the only justifiable reason to move the line south, depsite Main/49th being 3rd in the boarding/departures of 049's stops between Langara and Metrotown.
Ie. Punjabi Market simply isn't important enough to justify moving the line south and adding 1.5km of line.
---
You're not applying the law of parsimony properly.
49th + 41st is not any 'simpler' than 41st-Metrotown.
In
any way whatsoever.
You're switching arterials up a km.
That's not 'simpler'.
Also, the fact R4 already is on 41 means demand will grow faster for 41 stops than 49 stops.
Also,
https://dailyhive.com/vancouver/vancouver-plan-transportation-rapid-transit-skytrain-expansion
"He also emphasized that the actual routing and alignment will come at a later date in a future planning process led by TransLink, after a decision is made to prioritize the project."
Yes, it's a corridor, not a firm 'line.'
Even Kennedy Stewart acknowledges this, and he was directly involved in Transport and Metro 2050 and was one of the most influential stakeholders.
I wouldn't be surprised he was the primary person responsible for the line shift, because 'Punjabi Market'.
Metro 2040 assumed 41 all the way down (hence, why R4 is on 41), so this in and of itself is a shift.
----
Also, I've based all my lines directly off TransLink's corridors.
I'm not really 'predicting' anything (other than maybe Maple Ridge SkyTrain, but even that's on the Maple Ridge OCP.
You're just insisting something
not even the mayors involved insist of the lines they helped draw.
---
Broadway elevated uses a 50% contingency because it's a 50% contingency for the whole project.
Not just the elevated section.
Most of the tracks overall are still bored, so you wouldn't have a 25% contingency unless you split out the two sections, which Broadway does not do.