Originally Posted by Alex Mackinnon
I'm telling you, that's a political problem, not a technical one.
|
We will have to see how this works out in BC.
The problem with BC Hydro was until Site-C it had been years since it build a large scale project. Everyone involved in the older mega project were gone. Cost overruns and running behind schedule should be expected. Now with Cite-C under their belt (and the belt of their suppliers and contractors) they should be in a better position to deliver another site-C.
Until Site-C the liberal government was very much into public-private-partnerships and small scale projects.
We probably need both. A mix of small scale project and another one or two site-C type projects in the pipeline.