Quote:
Originally Posted by Migrant_Coconut
You can clearly see workers under the deck at the bottom-left. All they need to do is keep digging.
|
I think the question is that in "Step 4" it doesn't look like there's enough space between the bottom of the excavation and the road deck to fit an excavator in there.
And I guess the unspoken assumption is that there's access to the excavation from a property beside it below road level in order to haul out the spoils...