Quote:
Originally Posted by Marcus CLS
Construction has started. Marathon drilling has completed several cylindrical steel piles. Wood timber on site for excavation walls. As usual it is known this site has shallow overburden so once removed blasting equipment will arrive.
|
Blasting for this one too, eh? The neighbourhood FB group is already up in arms about all the blasting we've had for the 90 Champagne build.
Example:
"Does anyone know how long the blasting will go on in our neighbourhood? You have to wonder if a site that requires so much blasting and disruption should be built on at all. Or if the design choices are the right ones for that spot."