HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Business & the Economy


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #25  
Old Posted Aug 17, 2016, 2:35 PM
cairnstone cairnstone is offline
Registered User
 
Join Date: Jan 2010
Posts: 1,026
Quote:
Originally Posted by Sheba View Post
Esp when you consider they want the concrete to be poured within 90 minutes and it's going to take longer than that to drive from Chilliwack to downtown Van. They'd probably want it mixed and loaded into the trucks north of the Fraser.
That is what the engineers want but it is very surprising how far concrete travels and sits in a day. Its not uncommon for 5-6 trucks lined up full hiding 2 or 3 blocks away having coffee waiting to unload. If you look at plant locations and i have had concrete from tilbury for port work at neptune terminals. Today's mix designs and chemicals allows a lot more flexibility. May not make better concrete
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Business & the Economy
Forum Jump



Forum Jump


All times are GMT. The time now is 6:57 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.