HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 13, 2015, 9:31 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Received very positive feedback at CPC yesterday, goes to council soon.

One thing stood out from the presentation was the overwhelming list of transportation options for the site. 2 blocks from LRT City Hall station (both lines), 1 block from the high-frequency Route 1 / 305 combination, 2 blocks from the pathway system, walking distance to a few thousand downtown jobs and services etc.

It would be hard to have a better site to convince people that an idea like this can actually work. I would have no problems with these scattered throughout the Beltline. It has a similar access to transit and downtown with the bonus of great pedestrian-focused services.
__________________
From the right side of the wrong side of the tracks.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 4:34 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.