Posted Sep 25, 2013, 7:07 PM
|
|
Registered User
|
|
Join Date: Aug 2012
Posts: 286
|
|
Thanks KW. The elevator is scheduled for 2016 but the balconies are on the study for the next 3, not sure why they do it in 3 phases but that is what it is saying. I don't know if they are there for a structural reason or just because it is a "life-cycle" thing. How long did it take to tender your elevator, from decision to start of replacement? I thought if we are replacing balconies it would be better value to roll the exterior into one, even if it requires a larger one-time payment.
|