HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #1061  
Old Posted Oct 6, 2009, 3:21 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,253
Church seeks part of Bayview Public School site for seniors housing
http://www.ottawacitizen.com/Church+seeks+slice+Bayview+lands/2069383/story.html
Reply With Quote
     
     
  #1062  
Old Posted Oct 6, 2009, 7:28 PM
Proof Sheet Proof Sheet is offline
Registered User
 
Join Date: May 2009
Posts: 2,979
Quote:
Originally Posted by waterloowarrior View Post
Church seeks part of Bayview Public School site for seniors housing
http://www.ottawacitizen.com/Church+seeks+slice+Bayview+lands/2069383/story.html
Isn't this the one where the head of the church committee is a contractor???hmm
Reply With Quote
     
     
  #1063  
Old Posted Oct 7, 2009, 8:17 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,253
City aims to increase amount of buried hydro lines
By Peter Kovessy, Ottawa Business Journal Staff
Wed, Oct 7, 2009 1:00 PM EST
; } Click to Enlarge
The original plans for 300 Richmond Rd. in Westboro called for a rounded glass window at the corner of Eden Avenue. Hydro setback requirements forced the builder, Cassone Construction Ltd., to remove it. (Image supplied)
Overhead power lines puts city's residential intensification goals 'in jeopardy'

Domenic Cassone is a veteran Ottawa residential infill developer who wants to turn a former used car lot in the heart of Westboro into a five-storey mixed-use building.

The original design called for 5,000 square feet of ground-level retail space with 20 residential units above it. A rounded glazed glass window would run up the building located at the corner of Richmond Road and Eden Avenue, just east of Churchill Avenue.

However, Mr. Cassone, the president of Cassone Construction Ltd., says late in the process – after he had already been through a committee of adjustment hearing and an Ontario Municipal Board appeal – he was told the project did not comply with Hydro Ottawa's rules regulating the minimum distance between new buildings and power lines.

The former electrician says he had to redesign the building at a cost of approximately $25,000, delaying the project by nine months. The third, fourth and fifth floors were pushed back, reducing the floor space, and the rounded glass window eliminated.

"The (new) design is not comparable," says Mr. Cassone.

Hydro Ottawa requires a five-metre setback between overhead power lines and new buildings, constraining developers engaged in redevelopment projects in established neighbourhoods.

The city says the costs of meeting the setback requirements has caused several desirable infill projects to be delayed or cancelled and that the issue of overhead power lines is putting its intensification targets in jeopardy.

Developers are generally responsible for covering the cost of burying hydro wires, which is often in the millions of dollars. The price is typically anywhere from four to 10 times more than rebuilding an overhead system, making it unaffordable for many project proponents, especially in the case of lowrises.

Later this month, city council is expected to direct staff to start developing a policy on burying power lines, including a funding model.

"There is clearly a desire to put more wires underground," says Michael Murr, the city's manager of sustainability services.

"The difficulty with dropping lines is that, economically, it doesn't make sense to do it on a per-property basis."

Due to "other funding priorities," the former pre-amalgamation city of Ottawa abandoned an underground wiring program in 1993 that divided costs between the city, the former region of Ottawa-Carleton, the National Capital Commission, utility providers and project proponents or beneficiaries, according to a city staff report approved by committee last month.

Currently, developers are responsible for burying power lines in new residential subdivisions and pay Hydro Ottawa for all electrical installations. In return, the utility compensates developers for the anticipated revenue increase from the new residential customers.

However, smaller-scale infill projects typically have fewer units over which to spread the costs over, which frequently forces developers to work around the overhead lines.

In another Cassone Construction project, the developer says he paid approximately $20,000 to have Hydro Ottawa raise two hydro poles by approximately three metres. Mr. Cassone says he presented his plans for the four-unit, three-storey building at the corner of Fifth Avenue and Rupert Street, near the Rideau Canal, to a city committee multiple times. In each case, the plans were supposedly circulated to utility providers, but

Mr. Cassone says no one expressed concerns until the latter part of the planning process.

He says Hydro Ottawa refused to consider a partial burial of the power lines or installing a bracket that would have extended the lines away from the property.

"The way they are going, we are not going to be able to build anywhere pretty soon," he says.

One high-profile project that has apparently run afoul of the setback requirements is the plan to build condominiums on the site of the former Metropolitan Bible Church, at Bank Street and Gladstone Avenue.

The city says the issue "remains unresolved" and the developer, David Wex of Toronto-based Urban Capital, did not return calls seeking comment by deadline.


One of the easiest ways of accommodating setback requirements is to sacrifice floor space. This was the case on Booth Street, north of Gladstone Avenue, where Toon Dreessen, principal at Dreessen Architect Inc., designed the 21-unit Z6 Urban Lofts, currently under construction.

"We lost a significant chunk of space as a result of Hydro Ottawa's rules," he says, estimating about 1,000 square feet had to be eliminated over three floors.

Mr. Dreessen says he would like the city and hydro officials to look at burying power lines as part of larger infrastructure work, including the installation of separated storm water and sanitary sewer lines, aimed at encouraging the redevelopment in older neighbourhoods, such as the Booth Street area.

Otherwise, he says, developers will be forced to construct single-storey buildings on sites that have the potential to be four or five storeys.

"You end up building things you don't necessarily want, but you have no choice."

---

POWERING UP: RECENT DEVELOPMENT PROPOSALS AFFECTED BY CLEARANCE REQUIREMENTS

30 Bolton St. (Four-storey, 24-dwelling unit building): Project was cancelled after two years due to the five-metre clearance requirement.

19 Melrose Ave. (Conversion of an old school to lofts): An outdoor terrace on the top floor did not meet the five-metre clearance requirement. Hydro poles were relocated at the developer's expense.

300 Powell Ave. (Major condo project at the corner of Bronson and Powell avenues): Hydro poles were relocated to the opposite side of the street at the developer's expense. The project was then able to proceed, but development on the facing side of Bronson Avenue is now constrained because of the presence of overhead power lines.

560 and 594 Rideau St. (Two major mixed-use projects): The developer made an agreement to bury the power lines at its own expense ($1.5 million) to defray these costs.

453 Bank St. (224-unit condo project with retail space along Bank Street incorporating a heritage facade): A grandfather clause exempts the former Metropolitan Bible Church from the five-metre clearance requirement as long as significant changes are not made to the building. However, planned new construction on the site does not meet the five-metre clearance requirement and the file remains unresolved.

Source: City of Ottawa

---

FUNDING OPTIONS FOR BURYING EXISTING OVERHEAD LINES OR CONSTRUCTING NEW UNDERGROUND LINES
  • The requester (property owner or developer) pays the full cost of a buried installation, less the normal cost of building above ground. This is the predominant practice in Canada.
  • The city pays all of the cost from the general tax base. In Ottawa, newer area homebuyers already pay for underground utilities through the sale price.
  • The federal or provincial governments cover the cost, which is usually considered in heritage areas.
  • The utility provider pays, and adds the cost to its rates.
  • A combination of any or all of the above.
Source: City of Ottawa
Reply With Quote
     
     
  #1064  
Old Posted Oct 11, 2009, 2:10 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,595
Quote from the Bank Street BIA website:

Quote:
Mural Program / Facade Improvement Program
The Bank Street Business Improvement Area is planning a Mural Program and a Facade Improvement Grant Program to be rolled out in the spring of 2010. Please check back with us for program details and as they are made available.
Any know any other details about this? Should be really interesting; and long overdue for a few of the buildings along this stretch. I would love to see them fix up Barrymores, the dollar store building near Somerset with the aweful 1960's fins, and the strip of stores with the teal blue trim near Nepean? I think.
Reply With Quote
     
     
  #1065  
Old Posted Oct 11, 2009, 3:24 PM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
Quote:
Originally Posted by O-Town Hockey View Post
Quote from the Bank Street BIA website:

Any know any other details about this? Should be really interesting; and long overdue for a few of the buildings along this stretch. I would love to see them fix up Barrymores, the dollar store building near Somerset with the aweful 1960's fins, and the strip of stores with the teal blue trim near Nepean? I think.
If they cleaned up the Barrymore's facade and got rid of the fins that would be cool. That weirdy turret above the shoe store could probably use some cleanup too.
Reply With Quote
     
     
  #1066  
Old Posted Oct 12, 2009, 5:36 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 26,087
Quote:
Originally Posted by rakerman View Post
If they cleaned up the Barrymore's facade and got rid of the fins that would be cool. That weirdy turret above the shoe store could probably use some cleanup too.
You are right about Barrymore's - I was sitting having a coffee the other week and was struck by how shabby the exterior has become.
Reply With Quote
     
     
  #1067  
Old Posted Oct 13, 2009, 7:21 PM
amanfromnowhere's Avatar
amanfromnowhere amanfromnowhere is offline
Registered User
 
Join Date: Jul 2007
Location: Ottawa/Stockholm
Posts: 367
Reply With Quote
     
     
  #1068  
Old Posted Oct 13, 2009, 7:35 PM
blackjagger's Avatar
blackjagger blackjagger is offline
Registered User
 
Join Date: Jun 2009
Location: Ottawa, Ontario
Posts: 287
Hmm. Or instead of placing more jobs at the ends of our transit system which will not be fully developed for oh say 30 years, lets remove the damn height restriction so we can get some really office space in the downtown core. Or at least develop existing nodes, ie Tunney's along proposed and existing transit.
Reply With Quote
     
     
  #1069  
Old Posted Oct 13, 2009, 8:06 PM
bikegypsy's Avatar
bikegypsy bikegypsy is offline
Registered User
 
Join Date: Aug 2006
Posts: 985
Quote:
Originally Posted by blackjagger View Post
Hmm. Or instead of placing more jobs at the ends of our transit system which will not be fully developed for oh say 30 years, lets remove the damn height restriction so we can get some really office space in the downtown core. Or at least develop existing nodes, ie Tunney's along proposed and existing transit.
Agreed. It's a market that's begging to be developped and nothing is done about it.
It doesn't necessary mean that we would allow 60 story buildings.

There are many different options to be considered: easing the limit in the core by just a little, Permitting construction all the way to the queensway with medium heights, let's say 10 to15 stories. Like you said, the Tunney's option and even along King Edward which is just a decaying shame. Or just getting on with Lebreton asap. Honestly, what's wrong with these people... it's as if we're stuck in this strange fifties mode.

I'm surprised that developpers don't form a coalition to pressure authorites. Selling in the core has proven to be so easy.
Reply With Quote
     
     
  #1070  
Old Posted Oct 14, 2009, 1:21 AM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,595
Standard Life's site at Bank and Slater would be a perfect spot for a ~40 storey building (60 storeys would look way out of place). It's not going to block views of Parliament from anywhere and is far enough west of Metcalfe that most views from Gatineau would remain untouched. It's right on transit and along one of the busiest pedestrian streets in Ottawa. I'm not sure why none of the developers have even tried to propose something as such? I think as attitudes change in our city it might become more and more likely that something of this scale gets built. Just dreaming for now....
Reply With Quote
     
     
  #1071  
Old Posted Oct 14, 2009, 12:22 PM
blackjagger's Avatar
blackjagger blackjagger is offline
Registered User
 
Join Date: Jun 2009
Location: Ottawa, Ontario
Posts: 287
Quote:
Originally Posted by O-Town Hockey View Post
Standard Life's site at Bank and Slater would be a perfect spot for a ~40 storey building (60 storeys would look way out of place). It's not going to block views of Parliament from anywhere and is far enough west of Metcalfe that most views from Gatineau would remain untouched. It's right on transit and along one of the busiest pedestrian streets in Ottawa. I'm not sure why none of the developers have even tried to propose something as such? I think as attitudes change in our city it might become more and more likely that something of this scale gets built. Just dreaming for now....
I agree, I don't think we are going to see 60's any time soon and having only one or two with a field of 20's would seem a little strange. But there is a lot of potential for even a couple 35-45's to substantially improve both the office space issues downtown and the skyline. Developers must truly believe that the fight is impossibly, with Ottawa's office vacancy levels and rent per SF downtown there would be money to be made.

Cheers,
Josh
Reply With Quote
     
     
  #1072  
Old Posted Oct 14, 2009, 8:11 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,544
If the city were forward-looking, they would be trading relaxed height restrictions for higher quality design features. It's not as if the curret 6-block wall of 18-20 storey buidings does anything for vistas to Parliament Hill.
Reply With Quote
     
     
  #1073  
Old Posted Oct 14, 2009, 11:07 PM
adam-machiavelli adam-machiavelli is offline
Registered User
 
Join Date: Jun 2005
Posts: 1,246
There are no height restrictions, only policies regarding view corridor preservation.
Reply With Quote
     
     
  #1074  
Old Posted Oct 17, 2009, 2:52 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
I forget the name of the building project (perhaps I'll go look at it today and get pics of the site), but the little one 1 block east of Churchill on Scott...there's been a LOT of activity in this location recently after the location seemed stalled forever (land was mostly cleared and the initial hole for the foundation dug almost a year ago). They now have almost all of the basement and foundation built/formed, and they look like they are prepping to build the ground level of this little building. I think it's supposed to be 6 storeys when finished...
Reply With Quote
     
     
  #1075  
Old Posted Oct 18, 2009, 2:51 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,448
Quote:
Originally Posted by Davis137 View Post
I forget the name of the building project (perhaps I'll go look at it today and get pics of the site), but the little one 1 block east of Churchill on Scott...there's been a LOT of activity in this location recently after the location seemed stalled forever (land was mostly cleared and the initial hole for the foundation dug almost a year ago). They now have almost all of the basement and foundation built/formed, and they look like they are prepping to build the ground level of this little building. I think it's supposed to be 6 storeys when finished...
That would be the Stonework Lofts
http://www.stoneworklofts.com

You know, I don't think we have a thread for this project, do we?
Reply With Quote
     
     
  #1076  
Old Posted Oct 18, 2009, 1:04 PM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
Bank Street

Whatever happened to the project to put a new building where the James Street Pub is, and the Galaxy Camera project to do a building at Florence and Bank where the pizza place burned down? Are both projects on hold?
Reply With Quote
     
     
  #1077  
Old Posted Oct 18, 2009, 5:18 PM
Proof Sheet Proof Sheet is offline
Registered User
 
Join Date: May 2009
Posts: 2,979
Quote:
Originally Posted by rakerman View Post
Whatever happened to the project to put a new building where the James Street Pub is, and the Galaxy Camera project to do a building at Florence and Bank where the pizza place burned down? Are both projects on hold?
I know that got approved and it was going to displace the Celtic supporters club (they meet at the James Street pub whenever Celtic are playing)...I even told a friend of mine who is a rabid Celtic fan that and in the last year or so there seems to have been no activity.
Reply With Quote
     
     
  #1078  
Old Posted Oct 19, 2009, 9:38 AM
bikegypsy's Avatar
bikegypsy bikegypsy is offline
Registered User
 
Join Date: Aug 2006
Posts: 985
Quote:
Originally Posted by rakerman View Post
Whatever happened to the project to put a new building where the James Street Pub is, and the Galaxy Camera project to do a building at Florence and Bank where the pizza place burned down? Are both projects on hold?
I was wondering the same thing. If I remember correctly, it was similar in design to Central. I love that kind of project... perfect for Ottawa meaning that it incorporates contemporary urban living, adds density and still respects the (exagerated) height limits. I'd rather see 10 such buildings in the core than another horrible suburban single devlopment.
Reply With Quote
     
     
  #1079  
Old Posted Oct 19, 2009, 11:03 AM
danny the dog's Avatar
danny the dog danny the dog is offline
Registered User
 
Join Date: Sep 2009
Posts: 43
Government plans building boom

Public Works wants 5 office towers, hopes to loosen vacancy rates, rein in rents

By KATHRYN MAY, The Ottawa CitizenOctober 19, 2009 6:39 AM

OTTAWA — The federal government’s steady growth and voracious appetite for office space has turned Ottawa into the strongest office real estate market in North America. Now the government wants to heat up competition with a raft of new buildings.

With rock-bottom vacancy rates, the investment and pension funds that dominate the commercial office market can’t get enough of the city, sheltered as it is by its biggest employer, landlord and tenant.

“It’s the best market in North America,” said John O’Bryan vice-chairman of CB Richard Ellis Ltd. “Ottawa is exceptionally insulated. It’s like a micro-climate and that’s because so much of the downtown space is dependent on the federal government.”

After a decade of growth, the government is looking for a massive 4.1 million square feet of office space over the next five years. Having already eaten through all available downtown space, the government, through its realty arm, Public Works and Government Services, is set to build five new office towers across the region.

This construction in turn will loosen vacancy rates and rein in rents.

The move has some downtown building owners grumbling about the government trying to manipulate the market. But O’Bryan said he’s confident Public Works will act “responsibly.”

He says the government has to take this step. Office space is in such short supply that departments are stuck in sub-standard buildings. Low vacancy rates also drive up the rents that taxpayers pay.

“When the market is this tight … they have no choice but to build new space ..., but (Public Works) is aware of its impact on the market and will only put out enough for choice and not enough to unsettle the markets. The purpose is to balance the market … and be responsible,” said O’Bryan.

Some say this kind of tight market and building spree mirrors what was happening before the Liberals came to power in mid-1990s and sliced more than 50,000 jobs off the federal payroll.

Many bureaucrats say it’s just a matter of time before the government, anxious to get rid of the deficit, will cut the public service.

Retrenchment has begun with imposed wage controls, five-per-cent budget cuts department face under strategic reviews and hiring freezes.

“We are insulated only because of the federal government and if it stopped expanding, we would see little new development in Ottawa,” said Kelvin Holmes, manager director of Colliers Macaulay Nicolls Inc.

The public service is today bigger than it was before the Liberals’ downsizing. The growth has been fuelled by Conservative spending. They pumped billions into defence, security, the border and public health — even before the stimulus package aimed at combatting the recession. Last year, the core public service grew 4.5 per cent. Those numbers increase dramatically when the region’s entire public sector is counted, said Mario Lefebvre, director of municipal studies at the Conference Board of Canada. In 2008, public sector jobs — led by the feds — increased 12

per cent and are on course

for another 3.3-per-cent jump for this year. That’s an additional 22,000 jobs in two years, creating a total of 154,000 public sector jobs in Ottawa-Gatineau.

Lefebvre predicts job growth will slow, settling to 1.5 to two per cent a year.

He also says Canada’s deficit is temporary.

Others say the government has so much need for office space that any cuts would barely be felt unless departments close or move out of the region.

“Cabinet can decide to reduce the size of the public service tomorrow, but you can only shed space as leases expire,” said Nathan Smith, senior vice-president at Cushman & Wakefield Ottawa.

If the cuts are deep enough, then any new buildings on the drawing board could be stopped.

The government spends about $500 million a year on rent to house bureaucrats on both sides of the Ottawa River. It owns or leases half of the office space in the city of Ottawa. The consultants, lobbyists, think tanks, law firms, staffing agencies and other businesses that live off government occupy another 25 to 30 per cent.

In the next five years, about half of the government’s leased space — a whopping 8.6 million square feet — comes up for renewal.

And Public Works has told the real estate industry it needs about 4.1 million more square feet over that time.

It wants to:

n Replace about 1.5 million-square-feet of space it occupies in decrepit Crown-owned edifices, such as the Tupper and Sir John Carling buildings.

n Replace 1.8 million square feet in older leased buildings that don’t meet minimum leasing standards, everything from accessibility to air quality.

n Build about 800,000 new square feet. The five proposed office towers across the region will offer Public Works more “flexibility” than simply renewing — at rising lease rates. It would also allow Public Works to move some functions to the suburbs where costs are much cheaper.

The department has recently posted a notice it’s looking to redevelop the Lorne Building, former home of the National Gallery, on Elgin Street.

Public Works is calling for a 489,000-square-foot building on the site, along with the adjacent parking lot.

Plans for the Lorne Building will be scrutinized. It is considered a site of “national interest” and one of the last “jewels” on Ottawa’s ceremonial route, sitting across from the National Arts Centre, Confederation Park and within sight of the National War Memorial.

The government has talked for years about tearing down and rebuilding the 48-year-old building. The government wants a developer to design, build and manage the building, but it will rent the space and own the site when the lease expires. The Treasury Board and Finance are the most talked about tenants. It could be completed by March 2014.

Public Works is also expected to seek another 400,000 square feet downtown, which would mean another new tower.

There are only a few privately owned vacant sites left. The top contenders are the Standard Life Centre at Slater and Bank streets; Brookfield’s site bounded by Kent, Albert and Queen streets and GWL’s property at 256 Laurier Ave.

Also downtown, the Export Development Corporation is building a new headquarters at 150 Slater St. and will be vacating the 400,000 square feet space it occupies. Many expect it will be eventually filled by bureaucrats.

In Gatineau, where rents and taxes are cheaper, the government wants two new towers: a 425,000 square-foot tower on a downtown site yet to be selected and another 375,000-square-foot complex on a Crown-owned site beside National Defence’s Louis St. Laurent building on Boulevard de la Carrière. The government could seek bids by the end of the year.

These buildings will also shift more public service jobs to Gatineau to meet the requirement that 25 per cent of federal jobs in the capital be in Quebec.

Public Works is also looking for sites in the “east end” for a 250,000 square foot building. And it is planning to develop land it recently bought from Ontario at St. Laurent Boulevard and Tremblay Road.

The government is looking for private partners to develop a large new building to house civilian staff of the Department of National Defence.

A big wild card in this planning remains Nortel’s sprawling 2.2 million-square-foot campus on Carling Avenue. There’s been much speculation on whether National Defence, which wants out of the downtown for security reasons, would move there.

Some question whether the complex is a good fit for Defence or any department. But Smith said only the government could use a complex

that size and it will snap it up once prices reflect the depressed west side market where vacancies are about 20 per cent.

“There is no question in my mind that the federal government will end up occupying that site,” said Smith.
© Copyright (c) The Ottawa Citizen


Any idea of this will bring some development to Tunney's or Booth Street?
Reply With Quote
     
     
  #1080  
Old Posted Oct 19, 2009, 12:33 PM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
Quote:
Originally Posted by danny the dog View Post
Government plans building boom

Public Works wants 5 office towers, hopes to loosen vacancy rates, rein in rents
http://www.ottawacitizen.com/business/Government+plans+building+boom/2117981/story.html

I just hope they don't build more cheap, hideous, generic towers. I wonder if they will learn any lessons from the past.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 1:42 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.