  #121  
Old Posted Jun 24, 2026, 6:47 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,128
Excavator and dump trucks working on removing the dirt ramp down into the pit along the west wall this week.
Reply With Quote
     
     
  #122  
Old Posted Jun 27, 2026, 5:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,128
Big concrete pour today with two concrete pump trucks and parade of cement trucks pouring the SE corner floating raft slab section for this 31s building.

Last edited by jammer139; Jun 27, 2026 at 5:21 PM.
Reply With Quote
     
     
  #123  
Old Posted Jul 4, 2026, 2:16 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,128
They have dug out a lot of the dirt ramp along the west wall of the pit. The smaller excavator is now at the bottom while the larger one is outside the pit. Steel rebar for some of the L2 walls and posts as started on the east side of the pit on top of the new section of floating raft slab.
Reply With Quote
     
     
  #124  
Old Posted Jul 11, 2026, 7:25 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,128
Nearly done digging out the dirt access ramp along the west wall of pit. Large excavator has been removed leaving the small one at the bottom. They will use the crane to lift it out when ready. Have poured some concrete to seal the floor already in the NW corner of pit bottom. Will likely remove the small excavator and finish up the SW corner concrete seal soon. Forming for the floating raft slab on the west end of pit to follow. Have already poured some of the L2 posts on the east side of pit and working on more forming of L2 posts and walls.
Reply With Quote
     
     
  #125  
Old Posted Jul 16, 2026, 2:23 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,128
Forming and steel rebar getting setup for another section of floating raft slab on the west end of the now cleared pit. The small excavator has now been lifted out of the pit. They are also setting another tower crane base on the new section of future floating raft slab so this build will use two tower cranes.
Reply With Quote
     
     
  #126  
Old Posted Jul 25, 2026, 7:51 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,128
Another large concrete pour today with two concrete pump trucks and parade of cement trucks lined up on Waterloo St. Pouring another section of floating raft slab in the SW corner.
Reply With Quote
     
     
  #127  
Old Posted Jul 26, 2026, 12:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,128
Zedd webpage with new updated render showing the shorter 31s height for this building.


https://www.zeddarchitecture.com/20-058
Reply With Quote
     
     
  #128  
Old Posted Jul 26, 2026, 8:45 PM
CharlesSaticoy CharlesSaticoy is offline
Registered User
 
Join Date: May 2022
Posts: 38
Looks worse and not just because high is lower. The best attribute was glass portion that was vertical line and now that’s not even all glass. It’s like they don’t know how to design nice looking buildings. Shame
Reply With Quote
     
     
  #129  
Old Posted Jul 27, 2026, 12:44 PM
GreatTallNorth2 GreatTallNorth2 is offline
Registered User
 
Join Date: May 2006
Posts: 1,747
Although it is disappointing I never thought of this building as a major step forward in London's skyline. There are a lot of other projects that I am more excited about including 50 King, 743 Richmond and the development at 267 York. To me all of those projects will redefine the skyline. This one on King still adds a lot of residents and replaces a garage with a tower.
Reply With Quote
     
     
  #130  
Old Posted Jul 27, 2026, 1:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,128
Actually it would have had an even better impact on the skyline at 35s 110M (counting the mechanical penthouse) especially for those approaching west on Hamilton Rd. Still at 31s it will be prominent.

If the Kelloggs proposal happens for a 44s that will have a major impact on the skyline for those coming from the east on Dundas and south on Highbury. The Kelloggs proposals have been very quiet the past year. Will be interested to see if there is some movement on them once the Dundas BRT roadwork completes in 2027.

Last edited by jammer139; Jul 27, 2026 at 2:14 PM.
Reply With Quote
     
     
  #131  
Old Posted Yesterday, 9:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,128
They assembled the second Luffing Jib tower crane today. Wonder if this will be the last tower crane to go up in London in 2026?

Last edited by jammer139; Yesterday at 11:38 PM.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 3:02 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.