  #121  
Old Posted Jun 24, 2026, 6:47 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Excavator and dump trucks working on removing the dirt ramp down into the pit along the west wall this week.
Reply With Quote
     
     
  #122  
Old Posted Jun 27, 2026, 5:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Big concrete pour today with two concrete pump trucks and parade of cement trucks pouring the SE corner floating raft slab section for this 31s building.

Last edited by jammer139; Jun 27, 2026 at 5:21 PM.
Reply With Quote
     
     
  #123  
Old Posted Jul 4, 2026, 2:16 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
They have dug out a lot of the dirt ramp along the west wall of the pit. The smaller excavator is now at the bottom while the larger one is outside the pit. Steel rebar for some of the L2 walls and posts as started on the east side of the pit on top of the new section of floating raft slab.
Reply With Quote
     
     
  #124  
Old Posted Jul 11, 2026, 7:25 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Nearly done digging out the dirt access ramp along the west wall of pit. Large excavator has been removed leaving the small one at the bottom. They will use the crane to lift it out when ready. Have poured some concrete to seal the floor already in the NW corner of pit bottom. Will likely remove the small excavator and finish up the SW corner concrete seal soon. Forming for the floating raft slab on the west end of pit to follow. Have already poured some of the L2 posts on the east side of pit and working on more forming of L2 posts and walls.
Reply With Quote
     
     
  #125  
Old Posted Jul 16, 2026, 2:23 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Forming and steel rebar getting setup for another section of floating raft slab on the west end of the now cleared pit. The small excavator has now been lifted out of the pit. They are also setting another tower crane base on the new section of future floating raft slab so this build will use two tower cranes.
Reply With Quote
     
     
  #126  
Old Posted Jul 25, 2026, 7:51 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Another large concrete pour today with two concrete pump trucks and parade of cement trucks lined up on Waterloo St. Pouring another section of floating raft slab in the SW corner.
Reply With Quote
     
     
  #127  
Old Posted Yesterday, 12:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Zedd webpage with new updated render showing the shorter 31s height for this building.


https://www.zeddarchitecture.com/20-058
Reply With Quote
     
     
  #128  
Old Posted Yesterday, 8:45 PM
CharlesSaticoy CharlesSaticoy is offline
Registered User
 
Join Date: May 2022
Posts: 38
Looks worse and not just because high is lower. The best attribute was glass portion that was vertical line and now that’s not even all glass. It’s like they don’t know how to design nice looking buildings. Shame
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 8:22 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.