Quote:
Originally Posted by Sabien
They've been working on relocating the material that has been stored by the fence next to Water street for the past year. I assumed it was just being used up inside the building, but now I see that it's just being relocated to the far diagonal corner of the site.
Could this mean they're clearing that area to get ready to begin site prep for building #2?

|
Last year, there was something on ConstructConnect with a proposed start date for building #2 in August 2026.
I think we'd need to see a building permit filed for the foundation work yet, which means it's probably slipped, but maybe they'll still squeeze something in this year.
That or they don't want any supplies or materials stranded on the other side of the new road once it opens. I assume they'll have to set up some new fencing to stop folks from wandering around the site.