This one's moving along - it looks like excavation has finally bottomed out and there's an 'ahem' erection in place.


Nido up the street at 6692 Royal Oak is another story. That one seems to have been moving forward until 2022 and then there was silence (the existing buildings were knocked down and it's been a fenced off field ever since). There's vague mentions of a rezoning but that's it (and it's not listed on the Major Developments page anymore).
The second crane has been erected and is up for this one.

Which answers one of my questions - as to whether they were phasing the construction of the two towers or building them together.


After a several months long stalled period between when they completed site clearance of the previously existing buildings, and when they actually started excavation once the project got started back up, this one has been moving pretty briskly.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 1:31 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.