Posted Jul 21, 2026, 11:01 PM
|
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 9,131
|
|
Forming for the 3rd floor slab in the first building. Have installed the ground floor steel modular wall panels on the 2nd building. Forming has started on the parking garage structure.
|