HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #3421  
Old Posted Jul 17, 2026, 11:42 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,637
We're starting to see subway systems like NYC and Toronto flood at times and they seem to recover pretty quickly. I imagine it will be the same here.
Reply With Quote
     
     
  #3422  
Old Posted Jul 17, 2026, 1:03 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,471
They are installing trees at Moodie Station.

Any news on when testing will start?
Reply With Quote
     
     
  #3423  
Old Posted Jul 17, 2026, 1:19 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,400
Quote:
Originally Posted by VANRIDERFAN View Post
They are installing trees at Moodie Station.

Any news on when testing will start?
There were trains moving around Moodie last fall before the LRV bearing issues came up, not much seems to have happened since then.
Reply With Quote
     
     
  #3424  
Old Posted Jul 18, 2026, 2:13 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,540
Flood damage likely to delay west LRT extension, transit chair says
Canada Day storm damaged tracks and cabling, Glen Gower says

Andrew Foote · CBC News
Posted: Jul 17, 2026 2:42 PM EDT | Last Updated: 7 hours ago




Damage from the July 1 floods will likely further delay the opening of the city's western light rail extension, according to the chair of Ottawa's transit committee.

Ottawa was hit by severe thunderstorms on Canada Day that dropped nearly 167 millimetres of rain over about five hours on areas west of downtown.

The construction project to extend the O-Train to Moodie Drive and Algonquin College is among the damaged infrastructure, with its tracks running through some of the hardest-hit areas.

Tracks and cabling have been damaged, transit committee chair and Stittsville Coun. Glen Gower said Friday, adding that how long that might delay the west extension's opening won't be known for months.

"We were looking at a late 2027 launch," he told CBC Radio's Ottawa Morning. "I think it's fairly certain we're going to see that delayed by a few more months but we don't know exactly what the damage was yet."

Ottawa's Transit Services general manager Rick Leary on Wednesday said contractors are still investigating the storm damage to the extension and what it will take to repair it.

"This is going to take some time to complete, as all affected aspects of the west extension construction project must be carefully inspected," he said.

Five stations along the future Line 3 to Moodie station are impacted, he said: Sherbourne, New Orchard, Queensview, Pinecrest and Moodie itself, plus the the Kichi Zībī Mīkan tunnel near Westboro Beach.

Preliminary information from the Moodie station area is that floodwaters had a significant impact, Leary said.

Video shared with CBC News from the afternoon of July 1 shows several centimetres of water flowing over train tracks in the Moodie station area.

The city presentation also showed an unspecified section of track under several centimetres of standing water.

https://www.cbc.ca/news/canada/ottawa/ottawa-oc-transpo-west-extension-lrt-flood-9.7274267
Reply With Quote
     
     
  #3425  
Old Posted Jul 18, 2026, 5:51 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 28,840
They got the excuse they needed. I hope they use the time well.
Reply With Quote
     
     
  #3426  
Old Posted Jul 19, 2026, 1:07 AM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,630
Quote:
Originally Posted by J.OT13 View Post
We're starting to see subway systems like NYC and Toronto flood at times and they seem to recover pretty quickly. I imagine it will be the same here.
You're a funny guy.

https://www.youtube.com/watch?v=Pfcy15ZUE2c
__________________
I don't understand how communism works.
Reply With Quote
     
     
  #3427  
Old Posted Jul 19, 2026, 4:38 AM
golfguy9 golfguy9 is offline
Registered User
 
Join Date: Sep 2025
Posts: 62
Quote:
Originally Posted by Truenorth00 View Post
They got the excuse they needed. I hope they use the time well.
Yup. That article quoted late 2027 as the opening date before this storm. What a joke - walk by any section or station and you would probably predict it could open in a few months if they actually put their foot to the floor and cared. But no, I have to stare at 95% complete Dominion station on my walk to Westboro Beach every night.
Reply With Quote
     
     
  #3428  
Old Posted Jul 19, 2026, 2:15 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,637
With the train and staffing shortage, OC probably won't have the necessary resources to launch Stage 2 West for at least two years anyway.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:36 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.