The thread title may need an update based on this news release from the city that discloses at least one of the towers has grown to 18 floors.

Quote:
The City of Moncton maintained a high level of construction activity through the second quarter of 2026, with 422 building permits issued valued at $135.2 million, up from $112.1 million during the same period in 2025. The downtown area accounted for a significant share of this activity, with $58.1 million in permits issued. The year-to-date total for 2026 is $206.3 million.

Since April 1, residential construction in Moncton has totaled $78.5 million in permit value, representing 404 new housing units. Much of this development was concentrated downtown, where $51 million in residential permits was issued, representing 231 residential units. These figures highlight the continued role residential development plays in supporting growth across Moncton.

Among the larger residential projects this quarter was a revised $41-million, 183-unit building permit for one of the mixed-use towers at 200 Assomption Blvd. The project was first reported in the first quarter and reissued in the second quarter after plans were updated to add an 18th storey.

Also issued this quarter were permits for a $10-million, 48 unit, five-storey mixed-use development with a dental clinic on the ground floor at 16 Cameron St., and a $2.9-million, 24-unit three-storey mixed-use building at 130 Highlandview Rd.

“Moncton continued to see strong development activity in the second quarter,” says Mayor Shawn Crossman. “Residential construction remained strong, while continued commercial and industrial investment reflects confidence in Moncton’s economy and long-term growth.”

Commercial and industrial construction activity also strengthened in the second quarter, with total permit value reaching $46.9 million, up from $25.7 million in the first quarter of 2026. Major projects included a $17.3-million permit for an addition and renovations at Walmart Canada Corporate at 135 Frenette Ave., a $7.3-million foundation permit at 80 Frenette Ave. issued to Comztar Inc. for a one-storey base building, and a $3.6-million permit for exterior renovations to the Crowne Plaza Downtown Moncton Centreville at 1005 Main St.

Institutional building activity amounted to $6.9 million in the second quarter of 2026, which decreased from $37.5 million during the same period in 2025. Among the larger projects were a $2.1-million permit from the Province of New Brunswick for renovations to install a new CT scanner at 135 MacBeath Ave., a $1.1-million permit from the Province of New Brunswick to install four prefabricated classroom buildings at 45 McAuley Dr., and a $909,000 permit for renovations to the chemistry and biology lab at Atlantic Baptist College, located at 333 Gorge Rd.

“Downtown continues to attract strong investment,” says Luc Babineau, Director of Economic Development. “In just the first six months of 2026, downtown permit values reached $74 million, already surpassing the 10-year annual average of $52 million. This momentum reflects continued confidence in Moncton as a place to invest and grow.”
Reply With Quote
     
     
  #382  
Old Posted Jul 17, 2026, 5:58 PM
Leroy321 Leroy321 is offline
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 544
I wonder if only one will be 18 or both of them. I was told in the Spring that Lafford could only build as high as the gateway towers were, without jacking up the crane, and that would add an extra cost to construction, but maybe they were able to fit an extra floor in without the need for jacking the crane.
Reply With Quote
     
     
  #383  
Old Posted Jul 17, 2026, 6:45 PM
Taeolas Taeolas is offline
Registered User
 
Join Date: Oct 2009
Location: Fredericton
Posts: 5,033
Quote:
Originally Posted by Leroy321 View Post
I wonder if only one will be 18 or both of them. I was told in the Spring that Lafford could only build as high as the gateway towers were, without jacking up the crane, and that would add an extra cost to construction, but maybe they were able to fit an extra floor in without the need for jacking the crane.
That or maybe they see a future for taller construction in general in the region, so they're using this project to cover the cost of extending the crane now, so they're better positioned for future projects.
Reply With Quote
     
     
  #384  
Old Posted Jul 17, 2026, 7:46 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,998


The news of the 18th floor at Gateway is very interesting (and exciting). I too wonder about whether this is for both buildings. I kinda suspect it is,

Also, the $17.3M permit for the Walmart distribution centre expansion pretty much confirms what I had heard (a doubling in the size of the building).
__________________
Go 'Cats Go
Reply With Quote
     
     
  #385  
Old Posted Jul 17, 2026, 8:27 PM
jonny golden jonny golden is offline
Registered User
 
Join Date: May 2019
Posts: 2,915
Mr. Lafford could be encouraged by the success of the three sisters as well. He sees how strong the market is for this type of product downtown. I think he's getting a lot of baby boomers who are now empty nesters.

It makes me wonder what he'll eventually do with the old Tim Horton's property.
Reply With Quote
     
     
  #386  
Old Posted Jul 18, 2026, 12:35 AM
Leroy321 Leroy321 is offline
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 544
“183-unit building permit for one of the mixed-use towers at 200 Assomption” would this be the unit count for one of the buildings or could they of extended the buildings outward along with the height extension?
Reply With Quote
     
     
  #387  
Old Posted Jul 18, 2026, 1:51 AM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,998
Quote:
Originally Posted by Leroy321 View Post
“183-unit building permit for one of the mixed-use towers at 200 Assomption” would this be the unit count for one of the buildings or could they of extended the buildings outward along with the height extension?
Sounds reasonable. The original unit count for the Gateway development was (I believe) 350 units (175 units per tower).

The fact that Lafford is actually increasing the height of this building speaks to the success he is having in creating an entirely new neighbourhood in this section of downtown Moncton. The Third Sister must be filling up quickly.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #388  
Old Posted Jul 18, 2026, 3:51 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,998
One thing I like about Gateway now being 18 storeys is that it should be noticeably taller now than the Three Sisters (15 storeys). This will help to negate any possible "tabletop" effect from having such uniformity in height between these five buildings.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #389  
Old Posted Jul 18, 2026, 4:38 PM
jonny golden jonny golden is offline
Registered User
 
Join Date: May 2019
Posts: 2,915
Quote:
The Third Sister must be filling up quickly.
My thoughts as well. Why not take advantage by adding another floor, since the demand is so strong.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 9:40 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.