The tanks are being dug out of the old Petro Can this morning, and there are contractors walking on the roof of the St. Hubert.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #22  
Old Posted Oct 18, 2023, 2:39 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,676
With a name like Everest Peaks, I was expecting the tallest buildings in the city
Reply With Quote
     
     
  #23  
Old Posted Oct 18, 2023, 2:52 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,941
Its just the name of the street really, nothing original
Reply With Quote
     
     
  #24  
Old Posted Oct 20, 2023, 2:18 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,600
How about this for a crazy idea: Have a huge 2-3-story podium under the new buildings and move the Canadian Conservation Institute (CCI) into new facilities in that podium? That way, the buildings are not strictly residential with a few store fronts in the base, but are truly MIXED USE. Then replace the old CCI building with another tower or two, with all of the surrounding retail in the podium over there. And keep going in that vein until there is a dense node of true mixed-use buildings.

As much as I don’t like to see our light-industrial areas being used for towers, I do think that this is an area that can be redeveloped. And there should be very few NIMBYs.
Reply With Quote
     
     
  #25  
Old Posted May 17, 2024, 12:15 AM
dominatorp1 dominatorp1 is offline
Registered User
 
Join Date: Jul 2012
Posts: 2
Drove by the site today, and the gas station has been demolished. Must of happened in the last week or so.
Reply With Quote
     
     
  #26  
Old Posted Jul 6, 2026, 3:39 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,540
Updated proposal (July 2026)

Changes to the Proposed Development

The following changes have been made to the originally-proposed development design in response to comments received from the technical review:

The proposal now includes 913 residential units.
  • Building height: proposed building heights have been increased from 12 and 15 storeys in Submission 1, to 13 and 20 storeys in Submission 2, to 11, 13 and 30 storeys in Submission 3:
    • Towers 2 and 4, the westernmost buildings, have been reduced slightly in height to improve the transition between the mid-rise buildings to the west and the high-rise buildings fronting onto St. Laurent Boulevard. They have also been adjusted to feature slightly different heights, at 11 and 13 storeys respectively, to provide visual interest and reduce the repetition in building heights;
    • Towers 1 and 3 have been increased in height from 20 to 30 storeys in accordance with policies in the Official Plan, which direct high-rise heights to roads with wide rights-of-ways, such as St. Laurent Boulevard;
    • The tower floorplates for all buildings are now reduced to meet the recommended tower floorplate of 750 m2 gross floor area (GFA) for residential towers, with tower floorplates of 600 m2 provided;
  • Park Improvements: An unencumbered park block, comprising 10% of the lot area, is proposed for conveyance to the City of Ottawa. The park shape has been regularized and provides a rectangular, programmable area.
    • The previous iteration of the plan showed a privately-owned public space (POPS) with a partially-encumbered park space in the southeast corner. Following a modest recessing of the underground parking garage from the southern portion of the property, the park space is now unencumbered;
    • The park shape is regularized and more rectangular. The previous park design had a narrower frontage, but widened significantly in the interior of the site. The shape of the park has been changed to feature a more rectangular park shape. The park is not perfectly rectangular, however, due to the angled south property line;
    • The potential redevelopment of the property at 1800 St. Laurent Boulevard may provide the opportunity to create a rectangular park shape with a mirrored parkland conveyance to the south, as requested by Parks staff;
    • The grading on the site has also been reconsidered so that a continuous walkway from the east-west private road can lead to the park using a gradual slope, eliminating the need for the complex stair and pathway switchback design from the previous iteration;
    • Building 3 has been redesigned. In the previous submission, the building featured a wider podium with a carriageway to access the park. The building footprint has been reduced and the podium is narrower than in Submission 2. The carriageway has been removed, allowing for a widened park frontage on St. Laurent Boulevard;
  • Building design: the buildings have been redesigned. Whereas the previous design had a design that was generally carried to the upper floors, the revised design uses stacked, alternating rectangular shapes, with consistent breaks that create visual interest into the upper floors;
  • Building Siting:
    • The podium of Tower 3 has been reduced to provide more frontage for the park along St. Laurent Blvd;
    • Tower 2 is more square compared to the previous version, in which it was more rectangular in shape;
    • Tower 4 has been rotated 180 degrees, returning to the previous L-shaped design, so that the ‘L’ faces the interior of the site. This change was necessary to provide a sloped path to the park and opens up the building to the interior of the site and the park;
  • Drive Aisles have been Refined: the drive aisle and circulation patterns between Towers 1 and 2 have been further refined:
    • A second one-way vehicle lane has been added in front of Tower 2 for move-ins and move-outs. Waste collection will take place north of Tower 2, where recycling and garbage would be brought outside for pickup, but generally stored indoors otherwise;
    • Three (3) courier spaces have been added north of Tower 1 for drivers to pick up delivery orders from the St. Hubert restaurant;
    • The number of entrances for the south surface parking lot has been reduced from the previous two (2) entrances to one (1). Two-direction travel continues to be provided.
    • Two (2) short-term pick-up and drop-off spaces have been added to the private road between Towers 1 and 3. The previous design did not have short-term pick-up and drop-off spaces and there was a concern that if someone in a vehicle pulled over on the private road, it would block traffic and cause a spillover of traffic onto St. Laurent Boulevard. An additional eight (8) short-term pick-up and drop-off parallel parking spaces are proposed between Towers 2 and 4.

Affordable Housing

The client intends to finance the project with financing from both the Canada Mortgage and Housing Corporation (CMHC) and the City of Ottawa’s Affordable Housing Community Improvement Plan (CIP). Unit sizes have been developed to ensure that they are consistent with CMHC requirements. The affordable units will provide rents at average market rent (AMR), or lower as defined by the Canada Mortgage and Housing Corporation (CMHC) for the Ottawa portion of the Ottawa-Gatineau Census Metropolitan Area, for the entire rental housing stock, based on building form and unit type.

Affordable units will be dispersed throughout the developments and have equal access to communal amenities.


Architect: PMA Architectes


Development application:
https://devapps.ottawa.ca/en/applications/D07-12-21-0177/details

Siteplan:












Renderings:


























Last edited by rocketphish; Jul 6, 2026 at 3:54 PM.
Reply With Quote
     
     
  #27  
Old Posted Jul 6, 2026, 8:14 PM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,632
That's a pretty big change. Would love to see a building built in that form in Ottawa. Everything is so monoblock in shape.

I don't thing it's overly attractive or anything, just unique to us.
__________________
I don't understand how communism works.
Reply With Quote
     
     
  #28  
Old Posted Jul 6, 2026, 8:16 PM
CastlesintheSky CastlesintheSky is offline
Registered User
 
Join Date: Oct 2023
Posts: 63
Huge Improvement.
Start the build!
Reply With Quote
     
     
  #29  
Old Posted Jul 6, 2026, 10:02 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 26,161
I wonder how long the build out will be?
Reply With Quote
     
     
  #30  
Old Posted Jul 7, 2026, 1:23 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,666
Massive project for an area with no prospect of rapid transit. I hope the City at least increases bus frequency when this opens.

Any indication on the phasing.

Also, it has a drive-through. The design review panel recommended they "remove the drive-through and instead have street side parking for delivery services", and the developer responded "we won't be removing the drive-through, but thanks for pointing out we need parking for delivery, here's a bigger surface parking lot".
Reply With Quote
     
     
  #31  
Old Posted Jul 7, 2026, 1:37 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,798
Bus service is pretty decent here. There are 2 frequent routes on this section of St Laurent (40 and 41) with 7.5 min average headways in both directions.
Reply With Quote
     
     
  #32  
Old Posted Jul 9, 2026, 12:16 AM
pattherat pattherat is offline
Registered User
 
Join Date: Nov 2018
Posts: 196
My addiction to St. Hubert sauce would skyrocket if I lived above one!
Reply With Quote
     
     
  #33  
Old Posted Jul 9, 2026, 12:53 AM
skyscraperaccount skyscraperaccount is offline
Registered User
 
Join Date: Jun 2023
Posts: 291
Quote:
Originally Posted by J.OT13 View Post
Massive project for an area with no prospect of rapid transit. I hope the City at least increases bus frequency when this opens.

Any indication on the phasing.

Also, it has a drive-through. The design review panel recommended they "remove the drive-through and instead have street side parking for delivery services", and the developer responded "we won't be removing the drive-through, but thanks for pointing out we need parking for delivery, here's a bigger surface parking lot".
Maybe Alto will add a stop
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 7:21 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.