Posts: 9,133
Have started landing the 7th floor precast concrete floor slabs on the east end of the 8s south building. The 7th and 8th floor have a smaller footprint due to the step back on the west side.
Reply With Quote
     
     
  #62  
Old Posted Jan 13, 2026, 5:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
The 7th floor precast concrete floor slabs are now installed. Should see them start on installing the 7th floor precast walls and posts very soon.
Reply With Quote
     
     
  #63  
Old Posted Jan 16, 2026, 9:58 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
Wasting no time they have already started installing some of the 7th floor walls and posts on the south 8s building.
Reply With Quote
     
     
  #64  
Old Posted Feb 1, 2026, 12:58 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
They have wrapped up installing the 7th floor precast walls and posts. Should see the 8th floor precast concrete slabs being installed next week.
Reply With Quote
     
     
  #65  
Old Posted Feb 11, 2026, 3:30 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
Have started installing the 8th and final floor walls and posts.
Reply With Quote
     
     
  #66  
Old Posted Feb 23, 2026, 12:51 AM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,292
Old Oak is calling these two new buildings "Aurora."

Website: https://liveaurora.ca/
Reply With Quote
     
     
  #67  
Old Posted Feb 23, 2026, 2:18 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
Thats some artistic license being applied to the renders. Lake and mountains in the background and no other buildings.

Quote:
Originally Posted by CanadianTalk View Post
Old Oak is calling these two new buildings "Aurora."

Website: https://liveaurora.ca/
Reply With Quote
     
     
  #68  
Old Posted Feb 23, 2026, 8:17 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
They have now got about 50% of the 8th floor concrete precast roof slabs installed. Should finish this week and start on the mechanical penthouse next week.
Reply With Quote
     
     
  #69  
Old Posted Feb 27, 2026, 9:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
Wrapping up the 8th floor roof concrete slab install today. Should see the mechanical penthouse start next week.
Reply With Quote
     
     
  #70  
Old Posted Mar 5, 2026, 4:32 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
Installing the mechanical penthouse walls has started on the south 8s building. Window and balcony units installed up to the 6th floor as well. The north 8s building is well into the interior finishing with loads of drywall being installed.
Reply With Quote
     
     
  #71  
Old Posted Apr 10, 2026, 5:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
Well another tower crane is being removed from the London skyline with a heavy lift mobile crane disassembling the tower crane on this 8s apartment building project today. Old Oak will be busy into the summer months completing the exterior and interior finishing on these two buildings.
Reply With Quote
     
     
  #72  
Old Posted Apr 17, 2026, 12:25 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
Old Oak has started leasing the north building as units are being finished on the interior.
Reply With Quote
     
     
  #73  
Old Posted May 17, 2026, 4:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
Have now installed some of the paving for the entrance way and on top of the parking structure. The final windows and balcony doors are being installed on the 8th floor of the south building.
Reply With Quote
     
     
  #74  
Old Posted Jul 2, 2026, 11:13 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,133
Have made alot of progress installing landscaping and paving the driveway on this project.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 7:35 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.