Quote:
Originally Posted by madog222
They’ve place temporary structural supports on those mystery slabs at 96 Ave.
|
Interesting just temporary pads for those supports. I'm assuming two longer pieces will be placed on each side of the intersection with supports. And then a smaller piece will get placed in the middle versus trying to do a super long piece to span the entire intersection.
Since the supports are already going up I guess we'll see something happen in maybe 2-3 weeks.