  #121  
Old Posted Apr 29, 2026, 11:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,880
Arthur Voaden HS to close at end of this school year in St Thomas.

https://lfpress.com/news/local-news/arth...t-thomas-to-close-after-nearly-a-century
Reply With Quote
     
     
  #122  
Old Posted May 11, 2026, 4:31 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,880
They have picked up the pace on the concrete block walls and structural steel for the new Warbler Woods elementary school.
Reply With Quote
     
     
  #123  
Old Posted May 17, 2026, 4:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,880
The masonry contractor has started installing the concrete block walls for the new Catholic elementary school off Stackhouse Ave in NE London. A large delivery of structural steel is also now onsite.
Reply With Quote
     
     
  #124  
Old Posted May 24, 2026, 2:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,880
Have made alot of progress installing the exterior brick on the new elementary school in the Jackson neighborhood. The gym is getting a mix of exterior brick and siding.
Reply With Quote
     
     
  #125  
Old Posted May 30, 2026, 12:22 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,880
Final touch-ups on exterior brick and trim on the new Catholic Regina Mundi HS on Wellington Rd S. I would expect they are targeting completion in time for new school year in Sept.
Reply With Quote
     
     
  #126  
Old Posted May 31, 2026, 8:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,880
They have now installed the 2nd floor precast concrete floor slabs for the new elementary school in Warbler Woods.
Reply With Quote
     
     
  #127  
Old Posted Jun 9, 2026, 6:21 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,880
Alot of the structural steel is now installed for the new elementary school east of Stackhouse in NE London. Making alot of progress installing the concrete block for the gym. Still need to install the 2nd floor roof joist structural steel and the 2nd floor steel sheets for the concrete slab pour.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 2:32 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.