I rode over the bridge at 17:50 today. All the fencing along the west approach MUP is temporary scaffolding. Still quite a bit of work to be done on the side they opened today. Why don't they just wait for it to be finished before opening??? There's also a narrow section for ~25 m on the east approach with signs telling cyclists to dismount (none of the cyclists I saw, myself included, obeyed the sign). The barrier chicane had been already moved out of the way by other cyclists. I didn't stop to take any photos since I am too chicken when it comes to heights and absolutely despise riding over tall bridges. There is a nice lookout at the apex of the bridge.
Edit: posted at the same time as Lexus. Nice video as usual.
__________________
Vancouver born and raised | My Flickr
|