Posted May 30, 2026, 12:15 AM
|
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 9,017
|
|
They have now removed the external construction elevator from the north side of the 29s tower and the loading platform. Cleaning up the sidewalk areas around the north tower lobby.
|