Quote:
Originally Posted by monctonwatch
the moncton industrial park purchased 145 acres north of the tch between mapleton and mclaughlan, at one point i was shown a plan but can't seem to find it, but the plan included a new industrial park that will connect Queensway to Granite. That would alleviate some of the pressure for the elmwood exit if it ever gets built
|
You're right! I forgot about that.
I'm sure MID considers this a land bank however. It is land being held for future development, decades in the future.
Right now, they have just opened the Harrisville Logistics Park for development. There is a major expansion planned for the MID West Industrial Park. These alone will likely require 20 years or so to build out. It will be a long, long time before we see any MID activity north of the TCH.