772 Reardon Boulevard - four 6s and two 5s (Under Construction)

Drewlo is planning to build some more apartment buildings on the south side of Commissioners Road, east of Jackson Road as part of their "Jackson Meadows" subdivision.

Two 5-storey apartment buildings and four 6-storey apartment buildings, with a total of 352 residential units, are proposed at the southeast corner of Commissioners and Sweetgrass Blvd, which will be a new neighbourhood connector east of Jackson.

The design of the buildings is identical to all of their other new mid-rise buildings in London.

Planning application page: https://london.ca/business-development/p...nning-applications/772-reardon-boulevard

Planning application notice: https://london.ca/sites/default/files/2025-07/Z-25081%20-%20Notice%20of%20App%20%20PPM.pdf






Here is a link to Drewlo's Planning Justification and Design Report: https://london.ca/sites/default/files/20...d_Block%2050%2839T-06507_2%29_Drewlo.pdf
Reply With Quote
     
     
  #2  
Old Posted Jul 5, 2025, 9:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
Drewlo sure is getting their money's worth of those architectural drawings and engineering plans.
Reply With Quote
     
     
  #3  
Old Posted Sep 3, 2025, 4:23 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,292
City planning staff is recommending that Council approve these new buildings.

https://london.ca/sites/default/files/20...%20772%20Reardon%20Blvd%20%28MV%29_0.pdf

This goes to the planning committee on September 9th and then to the Council meeting on September 23rd.
Reply With Quote
     
     
  #4  
Old Posted Sep 24, 2025, 6:32 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,292
Council approved the zoning changes for this development at the September 23rd meeting.
Reply With Quote
     
     
  #5  
Old Posted Oct 27, 2025, 3:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
They have started pouring the concrete curbing for the new Reardon Rd street and it appears they have started the foundation for the first of the buildings.
Reply With Quote
     
     
  #6  
Old Posted Oct 31, 2025, 8:35 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
They have put down the base coat of asphalt for Reardon Blvd opening up the next phase of the Jackson Rd neighbourhood.
Reply With Quote
     
     
  #7  
Old Posted Nov 8, 2025, 9:05 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
L1 walls now being formed for the first building in this group of low rise apartment buildings.
Reply With Quote
     
     
  #8  
Old Posted Dec 14, 2025, 1:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
Nearly done pouring the L1 foundation walls of this first building.
Reply With Quote
     
     
  #9  
Old Posted Mar 10, 2026, 1:08 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
Already working on the foundation footings for building C. Looks like they have completed the L1 walls for building A and should be starting to form for the ground floor slab very soon.
Reply With Quote
     
     
  #10  
Old Posted Apr 4, 2026, 1:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
Forming for the ground floor slab of building A has started.
Reply With Quote
     
     
  #11  
Old Posted Apr 15, 2026, 8:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
They have now poured the ground floor slab of building A and are forming the first ground floor walls.
Reply With Quote
     
     
  #12  
Old Posted Apr 21, 2026, 9:07 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
They have now installed the 5s building A steel modular wall panels. Should see forming for the 2nd floor slab starting this week.
Reply With Quote
     
     
  #13  
Old Posted May 24, 2026, 2:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
Have now poured the L1 foundation walls for the next building on this site immediately south of the first one.
Reply With Quote
     
     
  #14  
Old Posted Jul 4, 2026, 12:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
Now that Drewlo has topped out the 2nd building on Evans that crew is now working on the first building on this site again with 2nd floor slab forming. Also the concrete crew has started working on the foundation footings for building C. Work on this site should show signs of more activity now.
Reply With Quote
     
     
  #15  
Old Posted Jul 11, 2026, 7:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
They have now installed the steel modular wall panels for the 2nd floor of the first building.
Reply With Quote
     
     
  #16  
Old Posted Jul 21, 2026, 11:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,127
Forming for the 3rd floor slab in the first building. Have installed the ground floor steel modular wall panels on the 2nd building. Forming has started on the parking garage structure.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 3:20 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.