HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #2341  
Old Posted Apr 24, 2026, 1:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,276
I think it's too late to separate this thread into individual buildings, but how would people feel if we separated the Ontario and Quebec sides?
Reply With Quote
     
     
  #2342  
Old Posted Apr 24, 2026, 3:25 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 8,964
Quote:
Originally Posted by zzptichka View Post
Would be awesome if they opened the ring dam for public. You can walk across the Hoover Dam after all.
LOL, I walked down there one day last week when the water first really started to surge, and ran into a fellow Raging Dam Enjoyer who was saying the same thing.

It would take a lot of lawyering and engineering, but imagine an enclosed cage-tube-thingy that you could walk across, especially this time of year. Or, at the other extreme, during low water late in the summer when all the rocks are exposed.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #2343  
Old Posted Apr 24, 2026, 3:32 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 8,964
Quote:
Originally Posted by zzptichka View Post
Good news is the levels have peaked.
1. Dang - where's that chart from?

2. That flow of water is way, way, way more than the "tourist flow" at Niagara Falls. I think it's on par with the size of the former Muskrat Falls in Labrador, now dammed. It's an amazing amount of water to be able to get close to.

3. Holy crap, that's two "Olympic swimming pool" volumes of water every second.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #2344  
Old Posted Apr 24, 2026, 4:15 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,340
Quote:
Originally Posted by Uhuniau View Post
1. Dang - where's that chart from?

2. That flow of water is way, way, way more than the "tourist flow" at Niagara Falls. I think it's on par with the size of the former Muskrat Falls in Labrador, now dammed. It's an amazing amount of water to be able to get close to.

3. Holy crap, that's two "Olympic swimming pool" volumes of water every second.
https://wateroffice.ec.gc.ca/report/real_time_e.html?stn=02KF005
__________________
My aerial Ottawa photos on Flickr đź“·
Reply With Quote
     
     
  #2345  
Old Posted Apr 28, 2026, 3:08 PM
number1zibifan number1zibifan is offline
Registered User
 
Join Date: Apr 2026
Posts: 1
Devil's hole

Hi everyone, been lurking in this thread for a while and decided to join the conversation.
I've been wondering if anyone has archived these plans when they were released initially. Since there has been quite some stir around Devil's hole in the past few months, I was curious to see how that area was initially planned vs. what's going to become of it.

Much care,


Quote:
Originally Posted by waterloowarrior View Post
a bunch of May 2019 final plans were posted recently
https://app01.ottawa.ca/postingplans/appDetails.jsf?lang=en&appId=__9682J0

the servicing plan shows a "pipe bridge" with two forcemains and water connections on the west side of Booth just north of the museum.
http://webcast.ottawa.ca/plan/All_Image%...ter%20Servicing%20Plan%20Section%201.PDF

here is the master site plan, which shows bike lanes etc. There is also a "Truss Bridge" plan which is about the same width (76m) of the Bronson Channel crossing and has pipes underneath.

Master Plan
http://webcast.ottawa.ca/plan/All_Image%...20FINAL%20Master%20Plan%20May%202019.PDF

Truss Bridge Plan
http://webcast.ottawa.ca/plan/All_Image%...0FINAL%20Truss%20Bridge%20May%202019.PDF

Phase 1A have some more detailed plans posted here too
https://app01.ottawa.ca/postingplans/appDetails.jsf?lang=en&appId=__0VCA6H
Reply With Quote
     
     
  #2346  
Old Posted Apr 28, 2026, 3:53 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,340
Quote:
Originally Posted by number1zibifan View Post
Hi everyone, been lurking in this thread for a while and decided to join the conversation.
I've been wondering if anyone has archived these plans when they were released initially. Since there has been quite some stir around Devil's hole in the past few months, I was curious to see how that area was initially planned vs. what's going to become of it.

Much care,
You mean this place? https://skyscraperpage.com/forum/showpost.php?p=9810245&postcount=1774

What's the stir?

In the NCC North Shore plans they have something about re-opening it eventually, but nothing concrete.
__________________
My aerial Ottawa photos on Flickr đź“·
Reply With Quote
     
     
  #2347  
Old Posted Apr 28, 2026, 4:32 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,426
Quote:
Originally Posted by number1zibifan View Post
Hi everyone, been lurking in this thread for a while and decided to join the conversation.
I've been wondering if anyone has archived these plans when they were released initially. Since there has been quite some stir around Devil's hole in the past few months, I was curious to see how that area was initially planned vs. what's going to become of it.

Much care,
If you Google for the devapp number "D07-12-14-0075", you'll find that there still are some of the old planning documents available out there.

For example, here's the Phase 1A Planning Rationale for Zibi from August 26, 2015.

Welcome to the forum!
Reply With Quote
     
     
  #2348  
Old Posted Apr 29, 2026, 6:37 PM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,582
Quote:
Originally Posted by number1zibifan View Post
Hi everyone, been lurking in this thread for a while and decided to join the conversation.
I've been wondering if anyone has archived these plans when they were released initially. Since there has been quite some stir around Devil's hole in the past few months, I was curious to see how that area was initially planned vs. what's going to become of it.

Much care,
Welcome welcome... all lurkers become posters eventually. The curiosity is too much to handle.
__________________
I don't understand how communism works.
Reply With Quote
     
     
  #2349  
Old Posted May 5, 2026, 1:03 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,276
Reply With Quote
     
     
  #2350  
Old Posted May 19, 2026, 9:10 PM
citydwlr citydwlr is offline
Registered User
 
Join Date: Mar 2013
Posts: 733
Didn't see this article posted in this thread yet. The architecture firm, Dialog Design, is moving into Block 207. Their logo is now pasted on the glass windows on the North-East corner of the second floor.

Quote:
Architecture firm Dialog chooses location near LeBreton Flats for local office

By Mia Jensen | May 14, 2026

An architecture firm with offices across Canada and in the U.S. is opening a local studio near LeBreton Flats, where it hopes to be involved in future development.

“We’ve had people living in Ottawa since 2016 and we’ve been doing projects there since well before that,” said Dialog’s chair Antonio Gómez-Palacio. “Frankly, opening a studio was us catching up to the presence that we had there already.”

Plans to open a studio were delayed by the pandemic and remote work, he added. Next week, the firm will launch its Ottawa location at 6 Booth St., an office building on Albert Island within the Zibi development.

It will be Dialog’s sixth studio, with others in Calgary, Toronto, Vancouver, Edmonton and San Francisco. The company has more than 600 staff across its offices, including 64 partners.

“We’re not a boutique firm running out of a single space,” said Gómez-Palacio. “I love our scale, because it means we can do really complex projects. We can do a hospital, we can do significant projects. We can be very selective around the projects that we do.”

Gómez-Palacio said Ottawa is “a window into the entire country,” with many national companies, organizations, and government departments headquartered in the city. Establishing a local presence, he said, opens up opportunities to connect with potential clients working on large-scale projects across the country.

Jie Chen, an architect and chair of the Ottawa studio, said the capital offers a variety of opportunities, with Dialog hoping to strengthen connections with key clients such as Public Services and Procurement Canada and the Department of National Defence.

Working across a range of disciplines, including urban design, engineering, landscape and interior design, Chen feels Dialog has something to offer.

“We have many collaborators and a lot of other consulting firms that have done amazing work in the National Capital Region, people who are our colleagues and friends,” said Chen. “But we do offer something different, which is an integrated design-focused practice. That model and that ecosystem don’t exist in the same form in Ottawa right now.”

Even before locating in the Ottawa market, Dialog has contributed to local projects, including uOttawa’s Advanced Medical Research Centre and modernization efforts at the Jeanne Mance Building on the Tunney’s Pasture campus.

Some of its biggest projects are ongoing. The modernization of the Lester B. Pearson Building is in its final phase, according to Chen. She said Dialog was involved in redesign efforts for three of the four towers, adding that the office buildings remained operational during the work, which presented unique challenges.

Planning for the project began a decade ago, before the pandemic. “We’ve had a lot of challenges and changes globally that have had a direct impact on this project,” Chen said. “It’s a project that was hugely complex, especially keeping in line with changes to work habits. It’s very interesting to follow along and see those adaptations happen as the project continues.”

Another more recent project was the Parliamentary Precinct redevelopment plan.

“(This is) hugely important nation-building work and a lot of the work touches directly on what Canada wants to be in the future,” said Chen. “These are just incredibly impactful projects that are very rewarding to be part of.”

Chen said the company is looking to contribute to other similar large-scale projects, and is monitoring federal investment in the defence sector and keeping a close eye on LeBreton Flats.

“We have actually been very intentional about the location of our studio,” said Chen. “It’s adjacent to LeBreton Flats and we see enormous opportunity and potential with how that site is being redeveloped, with the new library, a number of new towers going up and potentially the future arena.”

The company is also looking for more community-focused projects, including affordable housing, mixed-use, modular and inter-generational living developments. One such project that it has already worked on is the Heron Gate master plan, which will build more than 1,000 affordable housing units, mixed-use buildings, park space and active transit infrastructure.

“If Parliament Hill is a civic space for all Canadians, Heron Gate is a space for everyday life,” said Gómez-Palacio. “This was the reconfiguration of the neighbourhood from the perspective of community well-being. It (gave us) a significant understanding of how we can plan communities to be much more attuned with the well-being of individuals, of families and of the community as a whole.”

He added, “We’re terribly excited about it all. Our job is to look at the future, imagine it can be brighter, then help communities and our clients get to that space. The thing that keeps us excited in Ottawa is we think this is a place where we can do great work.”

Dialog’s Ottawa office will have 20 employees and expects to hire in the coming weeks.

“We don’t see other people in the consulting industry as our competition, but as people that we will work with,” Chen said. “I really think that the embrace of us into the design ecosystem in Ottawa has been overwhelmingly positive and I want us to continue building that momentum.”
Source: Ottawa Business Journal (via Dialog's website) [Bold text is my own]

Last edited by citydwlr; May 20, 2026 at 12:38 AM.
Reply With Quote
     
     
  #2351  
Old Posted May 20, 2026, 12:47 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,426
Quote:
Originally Posted by citydwlr View Post
Didn't see this article posted in this thread yet. The architecture firm, Dialog Design, is moving into Block 207. Their logo is now pasted on the glass windows on the North-East corner of the second floor.


Source: Ottawa Business Journal (via Dialog's website) [Bold text is my own]
This isn't really an article about Zibi, which is why it was posted instead over in this thread: https://skyscraperpage.com/forum/showthread.php?t=240483
Reply With Quote
     
     
  #2352  
Old Posted May 20, 2026, 12:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,276
Curious how many employees they have at Zibi and how much space they are taking. Good that Zibi is slowly starting to fill up.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 12:37 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.