Originally Posted by BlueJay View Post
Those forms are being replaced with different fly forms that will be used for the remainder of the tower after the pool floor is poured. With the removal of the forms, that is allowing the pre cast install to complete the hotel portion in the meantime. Crane swap is still happening at the end of May.
Thanks for the insight. Much appreciated!
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 1:15 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.