Quote:
Originally Posted by J.OT13 View Post
Snapped this picture yesterday. They seem to be removing the climbing form. Does that have to do with the crane swap BlueJay mentioned?
Quote:
Originally Posted by BlueJay View Post
Those forms are being replaced with different fly forms that will be used for the remainder of the tower after the pool floor is poured. With the removal of the forms, that is allowing the pre cast install to complete the hotel portion in the meantime. Crane swap is still happening at the end of May.
Will the hotel portion open before the construction of the higher floors is finished?

Last edited by J.OT13; May 13, 2026 at 2:00 PM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 12:10 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.